0% found this document useful (0 votes)
70 views10 pages

MIS Format

The document is a daily management information system report for January 8, 2016, detailing various parameters related to sales, inventory, production, quality, and other operational aspects. It includes status checks on raw material quality, production delays, customer complaints, and employee attendance. The report aims to identify issues and ensure adherence to targets across different departments.

Uploaded by

qms1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views10 pages

MIS Format

The document is a daily management information system report for January 8, 2016, detailing various parameters related to sales, inventory, production, quality, and other operational aspects. It includes status checks on raw material quality, production delays, customer complaints, and employee attendance. The report aims to identify issues and ensure adherence to targets across different departments.

Uploaded by

qms1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 10

MANAGEMENT INFORMATION SYSTEM(DAILY)

DATE: 08.01.2016 MONTH: JAN 2016


DEPT. PARAMETER SHIFT TARGET ACTUAL CUM.

SALE Sale Status (Rs.)

Raw material less than MIL(minimum


inventory level)

Was there any Quality issue in the Raw STATUS STATUS


Material Received? YES NO

Were any Supplier visting the Plant not STATUS STATUS


attended to on time? YES NO

Was receipt of any Raw Materials not as per STATUS STATUS


schedule? YES NO

Is any Supplier Test reports of Raw STATUS STATUS


Materials supplied pending? YES NO

Is the in house Lab reports of any the Raw STATUS STATUS


Materials received during the day, pending? YES NO

Perpetual(physical) invetory of costly item


STORE AND PURCHASE

Dead stock lquidation plan vs actual

No. of items Imbalance in set part

48 hours critical list

Temporary stock adjustment(physical vs


computer stock)

BOP(Bought out part) less than MIL

Raw material critical to production

BOP material critical to production

Raw material inventory cost (Lac)

Store and purchase


(Total employee/Absent employee)

Was there hold up in Production due to STATUS STATUS


Material shortage? YES NO

Was there hold up in Production due to any STATUS STATUS


Breakdown? YES NO
Is Lab / test reports of any of the Production STATUS STATUS
material pending? YES NO

Was there any Quality issue during STATUS STATUS


Production? YES NO

Is the establishment of the reason for the STATUS STATUS


Quality Issue during Production pending? YES NO

Was any deviation required for Production STATUS STATUS


from Standards established? YES NO

Yield%

Rework %

A
Production adherence
(No. of shots)
B

No. of machine run

No. of mould trial

Mould change over time in minutes


(Total time/No. of mould change)
INJECTION MOLDING

Lumps generation in kg

Machine breakdown hours

Total down hours A+B

OEE

A
Mould section Absenteeism
(Total employee/Absent employee) B
Was any commercial / logistics details for
dispatch of samples unavilable?
Delivery Adherence
(Delivered quantity)
Delivery Adherence
(Delivered parts)
Any critical to supply
(No. of parts)
Any short supply of customer end
(No. of cases)

Part in FG stock less than MIL

FG inventory cost

WIP inventory cost

Visual inspection Subros parts


(Total Employee/Absent employee)
Visual inspection Denso parts
(Total Employee/Absent employee)
Visual inspectionShivani parts
(Total Employee/Absent employee)
Assembly (Milex) absenteism
((Total Employee/Absent employee)
Door packing Assly Absenteism
(Total Employee/Absent employee)

Rejection PPM at inprocess stage 6000 1670

STATUS STATUS
Were there any Customer compliants ?
YES NO
Were any actions to contain the Customer STATUS STATUS
problem pending? YES NO
Were there any deadlines for documents /
STATUS STATUS
reports of customers to be met but not
Quality

YES NO
met ?

Rejection PPM at final stage

Abnormality from supplier end

Abnormality at customer end

SAMPLE INSPECTION REPORT AND STATUS


NEW PRODUCT
DEVELOPMENT

Are there any issues related with new STATUS STATUS


product development to be discussed? YES NO

Was any notification for Engineering


STATUS STATUS
changes received & the same not reviewed
YES NO
with all concerned?
STATUS STATUS
Were there any Customer compliants ?
YES NO
MARKETING

Were there any deadlines for documents /


STATUS STATUS
reports of customers to be met but not
YES NO
met ?
Were any actions to contain the Customer STATUS STATUS
problem pending? YES NO
Was there any information received from
STATUS STATUS
any customer / management / supplier & not
YES NO
shared with all concerned?
IT

Are there any issues related with Electronic STATUS STATUS


data communication system? YES NO
STATUS STATUS
YES NO
Was there any Manpower issue affecting STATUS STATUS
production? YES NO
HR

Was there any incident related with Factory STATUS STATUS


discipline? YES NO
STATUS STATUS
Was any safety requirement overlooked?
YES NO

CAM(Computer Aided Manufacturing)

CAD(Computer Aided Design)

Lower Setup time


Lower Cycle time

Lowering cost of Jig - Fixtures

Lower cost of Special Cutting tools

Enhance life of Gauges


COMMON

Lowering Tool cost

Lowering Cutting Tool & Tools sharpening


Cost

Lowering Tool cost

Power consumption

Fuel consumption

onward freight

inward freight

Are there any issues for discussion / STATUS STATUS


decision by Managment? YES NO
STATUS STATUS
Any other matter / issue
YES NO
N SYSTEM(DAILY)

DESCRIPTION OF THE GAP AND REASON


Was there hold up in Production due to Material shortage?
Was there hold up in Production due to any Breakdown?
Is Lab / test reports of any of the Production material pending?
Was there any Quality issue during Production?
Is the establishment of the reason for the Quality Issue during Production pending?
Was any deviation required for Production from Standards established?
Was any deviations made in the Dispatch plan?
Was there any logistics issue pertaining to delivery?
Is there any change in Dispatch plan for the current day?

Was any commercial / logistics details for dispatch of samples unavilable?


Are there any issues related with new product development to be discussed?
Were there any Customer compliants ?
Were any actions to contain the Customer problem pending?
Was any notification for Engineering changes received & the same not reviewed with all concerned?
Was there any information received from any customer / management / supplier & not shared with all concerned?
Were there any deadlines for documents / reports of customers to be met but not met ?
Were any Statutory payments / obligation due not completed on time?
Was there any Manpower issue affecting production?
Was there any incident related with Factory discipline?
Was any safety requirement overlooked?
Are there any issues for discussion / decision by Managment?
Are there any issues related with Electronic data communication system?
Any other matter / issue
concerned?
hared with all concerned?

You might also like