GENERAL SAFETY
GC07 Hot-work permit
Hot-work permits are required for any operation involving open flames or producing heat and/or sparks and must be prepared by a compete
include brazing, torch cutting, grinding, soldering and welding.
Company name Project title
Location Contract no.
Supervisor Permit no.
Contractor
Equipment used
Date of works between hrs and
Precautions to be taken
Hot work must cease at least one hour before end of shift. Areas where hot works have been carried out
should be checked before leaving site.
Services affected must be isolated before work commences.
Isolate smoke detectors in the vicinity of hot works.
A suitable fire extinguisher must be available and be kept close at hand, at all times.
Supervisors must ensure suitable personal protective equipment (PPE) is provided and worn by operatives.
All cylinders must be transported and secured upright.
Valves and hoses must be in good condition.
All cylinders must have flashback arrestors fitted.
When not in use, cylinders must be shut off and returned to store.
LPG cylinders must not be left in the building overnight without formal approval.
Arc welding equipment will comply with current standards.
Spent welding rods must be immersed in a bucket of water.
Minimum radius of hot work must be 2 m from other persons working. Screens should be erected if needed.
Where hot works are required adjacent to combustible material, a fireproof protective mat should be
placed between the material and the heat source during the hot works. (Check both sides of partition walls
to ensure that heat has not been transferred by conduction to combustible materials.)
Work areas to be kept tidy and free from combustible materials.
When operatives are working in riser shafts or on staging with cylinders, work will be secured and openings
to other levels covered with a fire blanket or other non-combustible materials.
Operatives must remain in the area for 15 minutes after completing work to ensure there is no hot-spot
residue.
Operatives carrying out hot work must:
understand the permit conditions and the fire and safety precautions
be in possession of a permit at all times
stop work if required to do so by an authorised person
immediately report any hazard likely to affect the fire and safety precautions
ensure satisfactory access to and egress from the work area.
© Construction Industry Training Board 2019 Construction site safety (GE7
GENERAL SAFETY
GC07 Hot-work permit continued
Confirmation by contractor’s supervisor: I confirm that the precautions specified above will be complied with and I will ensur
the persons carrying out the work described above are fully briefed on the safe method of work.
Name Position Signature Date
Confirmation by operator: I understand the precautions to be taken in carrying out the hot works.
Name Position Signature Date
Site management authorisation: I certify that the above work can commence with the precautions listed above.
Name Position Signature Date
Cancellation of permit by operator: (Note: hot works must cease at least one hour before end of shift.)
I confirm that the work has been completed and the area has been checked and is safe.
Name Position Signature Date
Cancellation of permit by site management
Name Position Signature Date
Inspection of area covered by hot-work permit by fire warden/site management after Inspection completed after
cancellation of permit
Name Position Signature Date
© Construction Industry Training Board 2019 Construction site safety (GE7
st be prepared by a competent person. Hot works
hrs
Yes No N/A
Yes No N/A
onstruction site safety (GE700) publication
mplied with and I will ensure that
Date
Date
above.
Date
Date
Date
ed after hr(s)
Date
onstruction site safety (GE700) publication