Hot Work Template

The document outlines the requirements and precautions for obtaining a hot-work permit, which is necessary for operations involving open flames or heat. It includes guidelines for safety measures, equipment handling, and responsibilities of supervisors and operatives. The permit must be completed by a competent person and includes sections for confirmation and cancellation by relevant personnel.

Uploaded by

zohaib hassan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views6 pages

Hot Work Template

The document outlines the requirements and precautions for obtaining a hot-work permit, which is necessary for operations involving open flames or heat. It includes guidelines for safety measures, equipment handling, and responsibilities of supervisors and operatives. The permit must be completed by a competent person and includes sections for confirmation and cancellation by relevant personnel.

Uploaded by

zohaib hassan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

GENERAL SAFETY

GC07 Hot-work permit


Hot-work permits are required for any operation involving open flames or producing heat and/or sparks and must be prepared by a compete
include brazing, torch cutting, grinding, soldering and welding.

Company name Project title

Location Contract no.

Supervisor Permit no.

Contractor

Equipment used

Date of works between hrs and

Precautions to be taken
Hot work must cease at least one hour before end of shift. Areas where hot works have been carried out
should be checked before leaving site.

Services affected must be isolated before work commences.

Isolate smoke detectors in the vicinity of hot works.

A suitable fire extinguisher must be available and be kept close at hand, at all times.

Supervisors must ensure suitable personal protective equipment (PPE) is provided and worn by operatives.

All cylinders must be transported and secured upright.

Valves and hoses must be in good condition.

All cylinders must have flashback arrestors fitted.

When not in use, cylinders must be shut off and returned to store.

LPG cylinders must not be left in the building overnight without formal approval.

Arc welding equipment will comply with current standards.

Spent welding rods must be immersed in a bucket of water.

Minimum radius of hot work must be 2 m from other persons working. Screens should be erected if needed.

Where hot works are required adjacent to combustible material, a fireproof protective mat should be
placed between the material and the heat source during the hot works. (Check both sides of partition walls
to ensure that heat has not been transferred by conduction to combustible materials.)

Work areas to be kept tidy and free from combustible materials.

When operatives are working in riser shafts or on staging with cylinders, work will be secured and openings
to other levels covered with a fire blanket or other non-combustible materials.

Operatives must remain in the area for 15 minutes after completing work to ensure there is no hot-spot
residue.

Operatives carrying out hot work must:

understand the permit conditions and the fire and safety precautions

be in possession of a permit at all times


stop work if required to do so by an authorised person

immediately report any hazard likely to affect the fire and safety precautions

ensure satisfactory access to and egress from the work area.

© Construction Industry Training Board 2019 Construction site safety (GE7

GENERAL SAFETY
GC07 Hot-work permit continued

Confirmation by contractor’s supervisor: I confirm that the precautions specified above will be complied with and I will ensur
the persons carrying out the work described above are fully briefed on the safe method of work.

Name Position Signature Date

Confirmation by operator: I understand the precautions to be taken in carrying out the hot works.

Name Position Signature Date

Site management authorisation: I certify that the above work can commence with the precautions listed above.

Name Position Signature Date

Cancellation of permit by operator: (Note: hot works must cease at least one hour before end of shift.)
I confirm that the work has been completed and the area has been checked and is safe.

Name Position Signature Date

Cancellation of permit by site management

Name Position Signature Date

Inspection of area covered by hot-work permit by fire warden/site management after Inspection completed after
cancellation of permit

Name Position Signature Date


© Construction Industry Training Board 2019 Construction site safety (GE7
st be prepared by a competent person. Hot works

hrs

Yes No N/A

Yes No N/A
onstruction site safety (GE700) publication

mplied with and I will ensure that

Date

Date

above.

Date

Date

Date

ed after hr(s)

Date
onstruction site safety (GE700) publication