DSR Month of August
DSR Month of August
Galaxy Blue Sa
Daily Site Report
       HT METER                     PRESENT READING                 PREVIOUS READING
          KWH                           15638.82                         15622.40
         KVAH                           15809.77                         15799.64
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                               5
   2     HVAC                                                                                     6
   3     PLUMBING                                                                                 8
   4     Fire Fighting & CCTV System                                                              0
   5     Lift & Escalators                                                                        0
   6     Cleaning (soft services)                                                                 0
   7     OTHERS                                                                                   1
         TOTAL                                                                                   20
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                     Date- 01-08-2024
PREVIOUS READING                 DIFF.                           CONSUMED (DIFF*900)
     15622.40                    16.42                                 14778.0
     15799.64                    10.13                                  9117.0
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                              B CHECK
         CUMULATIVE
                                    DONE                     DUE
              HRS.
             00;14;00
                                  9/15/2023               9/15/2024
                                  5/30/2024               5/30/2025
                                  6/2/2024                 6/2/2025
                                  4/6/2024                 4/6/2025
                        NOC STATUS
                          DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                           9/24/2023                      9/23/2026
                           9/20/2022                      9/20/2025
                               No
                          31--08-2019                      One time
                           10/5/2021                       One time
                           5/12/2024                      12/31/2026
                           5/12/2024                      12/31/2026
                              N/A
                              N/A
                           9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                    4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                    5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                    1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                    9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                    9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                    5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                     6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                     4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                         N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                         N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                         N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                         N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                         N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                         N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                         N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                               10
   2     HVAC                                                                                      6
   3     PLUMBING                                                                                  5
   4     Fire Fighting & CCTV System                                                               0
   5     Lift & Escalators                                                                         0
   6     Cleaning (soft services)                                                                  0
   7     OTHERS                                                                                    3
         TOTAL                                                                                   24
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                      Date- 02-08-2024
PREVIOUS READING                  DIFF.                           CONSUMED (DIFF*900)
     15638.82                     12.00                                 10800.0
     15809.77                     11.36                                 10224.0
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                             B CHECK
        CUMULATIVE
                                   DONE                     DUE
             HRS.
            04;18;00
            04;30;00             9/15/2023               9/15/2024
            04;18;00             5/30/2024               5/30/2025
            05;00;00             6/2/2024                 6/2/2025
                                 4/6/2024                 4/6/2025
                       NOC STATUS
                         DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                          9/24/2023                      9/23/2026
                          9/20/2022                      9/20/2025
                              No
                         31--08-2019                      One time
                          10/5/2021                       One time
                          5/12/2024                      12/31/2026
                          5/12/2024                      12/31/2026
                             N/A
                             N/A
                          9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                                6
   2     HVAC                                                                                     12
   3     PLUMBING                                                                                  4
   4     Fire Fighting & CCTV System                                                               0
   5     Lift & Escalators                                                                         0
   6     Cleaning (soft services)                                                                  4
   7     OTHERS                                                                                    5
         TOTAL                                                                                   31
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                     Date- 03-08-2024
PREVIOUS READING                 DIFF.                           CONSUMED (DIFF*900)
     15650.82                    14.51                                 13059.0
     15821.13                    15.55                                 13995.0
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                             B CHECK
        CUMULATIVE
                                   DONE                     DUE
             HRS.
            01;59;00
                                 9/15/2023               9/15/2024
                                 5/30/2024               5/30/2025
                                 6/2/2024                 6/2/2025
                                 4/6/2024                 4/6/2025
                       NOC STATUS
                         DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                          9/24/2023                      9/23/2026
                          9/20/2022                      9/20/2025
                              No
                         31--08-2019                      One time
                          10/5/2021                       One time
                          5/12/2024                      12/31/2026
                          5/12/2024                      12/31/2026
                             N/A
                             N/A
                          9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                   4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                   5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                   1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                   9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                   9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                   5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                    6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                    4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                               3
   2     HVAC                                                                                     2
   3     PLUMBING                                                                                 5
   4     Fire Fighting & CCTV System                                                              0
   5     Lift & Escalators                                                                        0
   6     Cleaning (soft services)                                                                 0
   7     OTHERS                                                                                   4
         TOTAL                                                                                   14
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                     Date- 04-08-2024
PREVIOUS READING                 DIFF.                           CONSUMED (DIFF*900)
     15665.33                    17.00                                 15300.0
     15836.68                    17.23                                 15507.0
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                             B CHECK
        CUMULATIVE
                                   DONE                     DUE
             HRS.
            02;18;00
            00;18;00             9/15/2023               9/15/2024
            00;12;00             5/30/2024               5/30/2025
            00;12;00             6/2/2024                 6/2/2025
                                 4/6/2024                 4/6/2025
                       NOC STATUS
                         DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                          9/24/2023                      9/23/2026
                          9/20/2022                      9/20/2025
                              No
                         31--08-2019                      One time
                          10/5/2021                       One time
                          5/12/2024                      12/31/2026
                          5/12/2024                      12/31/2026
                             N/A
                             N/A
                          9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                               5
   2     HVAC                                                                                     3
   3     PLUMBING                                                                                 5
   4     Fire Fighting & CCTV System                                                              0
   5     Lift & Escalators                                                                        0
   6     Cleaning (soft services)                                                                 0
   7     OTHERS                                                                                   3
         TOTAL                                                                                   16
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                    Date- 05-08-2024
PREVIOUS READING                DIFF.                           CONSUMED (DIFF*900)
     15682.33                   16.02                                 14418.0
     15853.91                   16.23                                 14607.0
                 995                      995
                1000                     1000
                1000                     1000
                1000                     1000
                 435                      435
                           0
                                         KWH                   0
                                                                                         NOC S
RVICE/AMC DUE DATE             REMARKS                       DESCRIPTION
    4/25/2025                                     HT INSTALLATION
    4/25/2025                                     TRF INSTALLATION
    4/25/2025                                     LT INSTALLATION
                                                  FIRE NOC
                                                  DG
    4/25/2025
                                                  EXPLOSIVE
                                                  COMPLETION CERTIFICATE
     5/2/2026                                     OCCUPANCY CERTIFICATE
                                                  LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                  JBL0739-IN
                                                  ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                 & TREVELATOR  (25+1)
                                                  E001 to E025 and T001
    9/14/2024                                     CTO WATER
                                                  CTO AIR
    9/15/2024                                     PPL
    5/30/2025                                     IPRSL
    6/2/2025                                      AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
                      5/12/2024                      12/31/2026
                      5/12/2024                      12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL
   2     HVAC
   3     PLUMBING
   4     Fire Fighting & CCTV System
   5     Lift & Escalators
   6     Cleaning (soft services)
   7     OTHERS
         TOTAL                                                                                    0
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                    Date- 06-08-2024
PREVIOUS READING                DIFF.                           CONSUMED (DIFF*900)
     15698.35                   15.96                                 14364.0
     15870.14                   16.00                                 14400.0
                 995                      995
                1000                     1000
                1000                     1000
                1000                     1000
                 435                      435
                           0
                                         KWH                   0
                                                                                         NOC S
RVICE/AMC DUE DATE             REMARKS                       DESCRIPTION
    4/25/2025                                     HT INSTALLATION
    4/25/2025                                     TRF INSTALLATION
    4/25/2025                                     LT INSTALLATION
                                                  FIRE NOC
                                                  DG
    4/25/2025
                                                  EXPLOSIVE
                                                  COMPLETION CERTIFICATE
     5/2/2026                                     OCCUPANCY CERTIFICATE
                                                  LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                  JBL0739-IN
                                                  ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                 & TREVELATOR  (25+1)
                                                  E001 to E025 and T001
    9/14/2024                                     CTO WATER
                                                  CTO AIR
    9/15/2024                                     PPL
    5/30/2025                                     IPRSL
    6/2/2025                                      AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
                      5/12/2024                      12/31/2026
                      5/12/2024                      12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                               8
   2     HVAC                                                                                     4
   3     PLUMBING                                                                                 3
   4     Fire Fighting & CCTV System                                                              0
   5     Lift & Escalators                                                                        0
   6     Cleaning (soft services)                                                                 0
   7     OTHERS                                                                                   4
         TOTAL                                                                                   19
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                    Date- 07-08-2024
PREVIOUS READING                DIFF.                           CONSUMED (DIFF*900)
     15714.31                   15.40                                 13860.0
     15886.14                   15.57                                 14013.0
                 995                      995
                1000                     1000
                1000                     1000
                1000                     1000
                 435                      435
                           0
                                         KWH                   0
                                                                                         NOC S
RVICE/AMC DUE DATE             REMARKS                       DESCRIPTION
    4/25/2025                                     HT INSTALLATION
    4/25/2025                                     TRF INSTALLATION
    4/25/2025                                     LT INSTALLATION
                                                  FIRE NOC
                                                  DG
    4/25/2025
                                                  EXPLOSIVE
                                                  COMPLETION CERTIFICATE
     5/2/2026                                     OCCUPANCY CERTIFICATE
                                                  LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                  JBL0739-IN
                                                  ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                 & TREVELATOR  (25+1)
                                                  E001 to E025 and T001
    9/14/2024                                     CTO WATER
                                                  CTO AIR
    9/15/2024                                     PPL
    5/30/2025                                     IPRSL
    6/2/2025                                      AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
                      5/12/2024                      12/31/2026
                      5/12/2024                      12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                               1
   2     HVAC                                                                                     2
   3     PLUMBING                                                                                 3
   4     Fire Fighting & CCTV System                                                              0
   5     Lift & Escalators                                                                        0
   6     Cleaning (soft services)                                                                 0
   7     OTHERS                                                                                   1
         TOTAL                                                                                    7
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                    Date- 08-08-2024
PREVIOUS READING                DIFF.                           CONSUMED (DIFF*900)
     15729.71                   15.33                                 13797.0
     15901.71                   15.42                                 13878.0
                 995                      995
                1000                     1000
                1000                     1000
                1000                     1000
                 435                      435
                           0
                                         KWH                   0
                                                                                         NOC S
RVICE/AMC DUE DATE             REMARKS                       DESCRIPTION
    4/25/2025                                     HT INSTALLATION
    4/25/2025                                     TRF INSTALLATION
    4/25/2025                                     LT INSTALLATION
                                                  FIRE NOC
                                                  DG
    4/25/2025
                                                  EXPLOSIVE
                                                  COMPLETION CERTIFICATE
     5/2/2026                                     OCCUPANCY CERTIFICATE
                                                  LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                  JBL0739-IN
                                                  ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                 & TREVELATOR  (25+1)
                                                  E001 to E025 and T001
    9/14/2024                                     CTO WATER
                                                  CTO AIR
    9/15/2024                                     PPL
    5/30/2025                                     IPRSL
    6/2/2025                                      AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
                      5/12/2024                      12/31/2026
                      5/12/2024                      12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                                8
   2     HVAC                                                                                      5
   3     PLUMBING                                                                                 10
   4     Fire Fighting & CCTV System                                                               0
   5     Lift & Escalators                                                                         0
   6     Cleaning (soft services)                                                                  0
   7     OTHERS                                                                                    4
         TOTAL                                                                                   27
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                    Date- 09-08-2024
PREVIOUS READING                DIFF.                           CONSUMED (DIFF*900)
     15745.04                   15.64                                 14076.0
     15917.13                   15.74                                 14166.0
                 995                      995
                1000                     1000
                1000                     1000
                1000                     1000
                 435                      435
                           0
                                         KWH                   0
                                                                                         NOC S
RVICE/AMC DUE DATE             REMARKS                       DESCRIPTION
    4/25/2025                                     HT INSTALLATION
    4/25/2025                                     TRF INSTALLATION
    4/25/2025                                     LT INSTALLATION
                                                  FIRE NOC
                                                  DG
    4/25/2025
                                                  EXPLOSIVE
                                                  COMPLETION CERTIFICATE
     5/2/2026                                     OCCUPANCY CERTIFICATE
                                                  LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                  JBL0739-IN
                                                  ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                 & TREVELATOR  (25+1)
                                                  E001 to E025 and T001
    9/14/2024                                     CTO WATER
                                                  CTO AIR
    9/15/2024                                     PPL
    5/30/2025                                     IPRSL
    6/2/2025                                      AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
                      5/12/2024                      12/31/2026
                      5/12/2024                      12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                           AMC STATUS
 S.No.                                    SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                             4/25/2024                  4/25/2025
   2     LT BREAKERS                             4/25/2024                  4/25/2025
   3     PLC PANEL                               4/25/2024                  4/25/2025
  4      TRANSFORMER-1                         Under warranty
  5      TRANSFORMER-2                         Under warranty
   6     TRANSFORMER-3                           4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                    5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR                01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                              9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                   Under warranty
  14     DG SET-3 (1500 KVA)                     9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                     5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                     6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                      4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                                N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                                N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                                N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                                N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                                N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                                N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                                       N/A                                   N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                          DESCRIPTION                                                      QTY
   1     ELECTRICAL                                                                                5
   2     HVAC                                                                                      6
   3     PLUMBING                                                                                 13
   4     Fire Fighting & CCTV System                                                               0
   5     Lift & Escalators                                                                         0
   6     Cleaning (soft services)                                                                  0
   7     OTHERS                                                                                    4
         TOTAL                                                                                   28
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                    Date- 10-08-2024
PREVIOUS READING                DIFF.                           CONSUMED (DIFF*900)
     15760.68                   15.97                                 14373.0
     15932.87                   16.06                                 14454.0
                 995                      995
                1000                     1000
                1000                     1000
                1000                     1000
                 435                      435
                           0
                                         KWH                   0
                                                                                         NOC S
RVICE/AMC DUE DATE             REMARKS                       DESCRIPTION
    4/25/2025                                     HT INSTALLATION
    4/25/2025                                     TRF INSTALLATION
    4/25/2025                                     LT INSTALLATION
                                                  FIRE NOC
                                                  DG
    4/25/2025
                                                  EXPLOSIVE
                                                  COMPLETION CERTIFICATE
     5/2/2026                                     OCCUPANCY CERTIFICATE
                                                  LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                  JBL0739-IN
                                                  ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                 & TREVELATOR  (25+1)
                                                  E001 to E025 and T001
    9/14/2024                                     CTO WATER
                                                  CTO AIR
    9/15/2024                                     PPL
    5/30/2025                                     IPRSL
    6/2/2025                                      AVIATION LIGHT
     4/6/2025
N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
                      5/12/2024                      12/31/2026
                      5/12/2024                      12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
                                             REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                                5
   2     HVAC                                                                                      6
   3     PLUMBING                                                                                 10
   4     Fire Fighting & CCTV System                                                               0
   5     Lift & Escalators                                                                         0
   6     Cleaning (soft services)                                                                  0
   7     OTHERS                                                                                    4
         TOTAL                                                                                   25
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                     Date- 11-08-2024
PREVIOUS READING                 DIFF.                            CONSUMED (DIFF*900)
     15776.65                    21.72                                  19548.0
     15948.93                    13.95                                  12555.0
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                             B CHECK
        CUMULATIVE
                                   DONE                     DUE
             HRS.
            01;00;00
            01;00;00             9/15/2023               9/15/2024
            00;54;00             5/30/2024               5/30/2025
            00;54;00             6/2/2024                 6/2/2025
            00;24;00             4/6/2024                 4/6/2025
                       NOC STATUS
                         DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                          9/24/2023                      9/23/2026
                          9/20/2022                      9/20/2025
                              No
                         31--08-2019                      One time
                          10/5/2021                       One time
                          5/12/2024                      12/31/2026
                          5/12/2024                      12/31/2026
                             N/A
                             N/A
                          9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                                3
   2     HVAC                                                                                      5
   3     PLUMBING                                                                                 16
   4     Fire Fighting & CCTV System                                                               0
   5     Lift & Escalators                                                                         0
   6     Cleaning (soft services)                                                                  0
   7     OTHERS                                                                                    0
         TOTAL                                                                                   24
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                    Date- 12-08-2024
PREVIOUS READING                DIFF.                           CONSUMED (DIFF*900)
     15798.37                    6.67                                  6003.0
     15962.88                   14.62                                 13158.0
                 860                      860
                 870                      870
                 860                      860
                 860                      860
                 415                      415
                           0
                                         KWH                   0
                                                                                         NOC S
RVICE/AMC DUE DATE             REMARKS                       DESCRIPTION
    4/25/2025                                     HT INSTALLATION
    4/25/2025                                     TRF INSTALLATION
    4/25/2025                                     LT INSTALLATION
                                                  FIRE NOC
                                                  DG
    4/25/2025
                                                  EXPLOSIVE
                                                  COMPLETION CERTIFICATE
     5/2/2026                                     OCCUPANCY CERTIFICATE
                                                  LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                  JBL0739-IN
                                                  ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                 & TREVELATOR  (25+1)
                                                  E001 to E025 and T001
    9/14/2024                                     CTO WATER
                                                  CTO AIR
    9/15/2024                                     PPL
    5/30/2025                                     IPRSL
    6/2/2025                                      AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                          B CHECK
         CUMULATIVE
                                DONE                     DUE
             HRS.
                              9/15/2023               9/15/2024
                              5/30/2024               5/30/2025
                              6/2/2024                 6/2/2025
                              4/6/2024                 4/6/2025
                    NOC STATUS
                      DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                       9/24/2023                      9/23/2026
                       9/20/2022                      9/20/2025
                           No
                      31--08-2019                      One time
                       10/5/2021                       One time
                       5/12/2024                      12/31/2026
                       5/12/2024                      12/31/2026
                          N/A
                          N/A
                       9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                                4
   2     HVAC                                                                                      5
   3     PLUMBING                                                                                 12
   4     Fire Fighting & CCTV System                                                               0
   5     Lift & Escalators                                                                         0
   6     Cleaning (soft services)                                                                  3
   7     OTHERS                                                                                    0
         TOTAL                                                                                   24
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                    Date- 13-08-2024
PREVIOUS READING                DIFF.                           CONSUMED (DIFF*900)
     15805.04                   15.10                                 13590.0
     15977.50                   15.18                                 13662.0
                 860                      860
                 870                      870
                 860                      860
                 860                      860
                 415                      415
                           0
                                         KWH                   0
                                                                                         NOC S
RVICE/AMC DUE DATE             REMARKS                       DESCRIPTION
    4/25/2025                                     HT INSTALLATION
    4/25/2025                                     TRF INSTALLATION
    4/25/2025                                     LT INSTALLATION
                                                  FIRE NOC
                                                  DG
    4/25/2025
                                                  EXPLOSIVE
                                                  COMPLETION CERTIFICATE
     5/2/2026                                     OCCUPANCY CERTIFICATE
                                                  LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                  JBL0739-IN
                                                  ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                 & TREVELATOR  (25+1)
                                                  E001 to E025 and T001
    9/14/2024                                     CTO WATER
                                                  CTO AIR
    9/15/2024                                     PPL
    5/30/2025                                     IPRSL
    6/2/2025                                      AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
                      5/12/2024                      12/31/2026
                      5/12/2024                      12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                                5
   2     HVAC                                                                                      6
   3     PLUMBING                                                                                 10
   4     Fire Fighting & CCTV System                                                               0
   5     Lift & Escalators                                                                         2
   6     Cleaning (soft services)                                                                  2
   7     OTHERS                                                                                    0
         TOTAL                                                                                   25
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                    Date- 14-08-2024
PREVIOUS READING                DIFF.                           CONSUMED (DIFF*900)
     15820.14                   15.34                                 13806.0
     15992.68                   15.44                                 13896.0
                 860                      860
                 870                      870
                 860                      860
                 860                      860
                 415                      415
                           0
                                         KWH                   0
                                                                                         NOC S
RVICE/AMC DUE DATE             REMARKS                       DESCRIPTION
    4/25/2025                                     HT INSTALLATION
    4/25/2025                                     TRF INSTALLATION
    4/25/2025                                     LT INSTALLATION
                                                  FIRE NOC
                                                  DG
    4/25/2025
                                                  EXPLOSIVE
                                                  COMPLETION CERTIFICATE
     5/2/2026                                     OCCUPANCY CERTIFICATE
                                                  LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                  JBL0739-IN
                                                  ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                 & TREVELATOR  (25+1)
                                                  E001 to E025 and T001
    9/14/2024                                     CTO WATER
                                                  CTO AIR
    9/15/2024                                     PPL
    5/30/2025                                     IPRSL
    6/2/2025                                      AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
                      5/12/2024                      12/31/2026
                      5/12/2024                      12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL
   2     HVAC
   3     PLUMBING
   4     Fire Fighting & CCTV System
   5     Lift & Escalators
   6     Cleaning (soft services)
   7     OTHERS
         TOTAL                                                                                    0
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                    Date- 15-08-2024
PREVIOUS READING                DIFF.                           CONSUMED (DIFF*900)
     15835.48                   16.42                                 14778.0
     16008.12                   16.53                                 14877.0
                 860                      860
                 870                      870
                 860                      860
                 860                      860
                 415                      415
                           0
                                         KWH                   0
                                                                                         NOC S
RVICE/AMC DUE DATE             REMARKS                       DESCRIPTION
    4/25/2025                                     HT INSTALLATION
    4/25/2025                                     TRF INSTALLATION
    4/25/2025                                     LT INSTALLATION
                                                  FIRE NOC
                                                  DG
    4/25/2025
                                                  EXPLOSIVE
                                                  COMPLETION CERTIFICATE
     5/2/2026                                     OCCUPANCY CERTIFICATE
                                                  LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                  JBL0739-IN
                                                  ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                 & TREVELATOR  (25+1)
                                                  E001 to E025 and T001
    9/14/2024                                     CTO WATER
                                                  CTO AIR
    9/15/2024                                     PPL
    5/30/2025                                     IPRSL
    6/2/2025                                      AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
                      5/12/2024                      12/31/2026
                      5/12/2024                      12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                                5
   2     HVAC                                                                                     25
   3     PLUMBING                                                                                  6
   4     Fire Fighting & CCTV System                                                               0
   5     Lift & Escalators                                                                         0
   6     Cleaning (soft services)                                                                  0
   7     OTHERS                                                                                    0
         TOTAL                                                                                   36
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                    Date- 16-08-2024
PREVIOUS READING                DIFF.                           CONSUMED (DIFF*900)
     15851.90                   16.04                                 14436.0
     16024.65                   16.19                                 14571.0
                 860                      860
                 870                      870
                 860                      860
                 860                      860
                 415                      415
                           0
                                         KWH                   0
                                                                                         NOC S
RVICE/AMC DUE DATE             REMARKS                       DESCRIPTION
    4/25/2025                                     HT INSTALLATION
    4/25/2025                                     TRF INSTALLATION
    4/25/2025                                     LT INSTALLATION
                                                  FIRE NOC
                                                  DG
    4/25/2025
                                                  EXPLOSIVE
                                                  COMPLETION CERTIFICATE
     5/2/2026                                     OCCUPANCY CERTIFICATE
                                                  LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                  JBL0739-IN
                                                  ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                 & TREVELATOR  (25+1)
                                                  E001 to E025 and T001
    9/14/2024                                     CTO WATER
                                                  CTO AIR
    9/15/2024                                     PPL
    5/30/2025                                     IPRSL
    6/2/2025                                      AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
                      5/12/2024                      12/31/2026
                      5/12/2024                      12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                                3
   2     HVAC                                                                                      2
   3     PLUMBING                                                                                 15
   4     Fire Fighting & CCTV System                                                               0
   5     Lift & Escalators                                                                         0
   6     Cleaning (soft services)                                                                  0
   7     OTHERS                                                                                    5
         TOTAL                                                                                   25
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                    Date- 17-08-2024
PREVIOUS READING                DIFF.                           CONSUMED (DIFF*900)
     15867.94                   16.23                                 14607.0
     16040.84                   16.14                                 14526.0
                 860                      860
                 870                      870
                 860                      860
                 860                      860
                 415                      415
                           0
                                         KWH                   0
                                                                                         NOC S
RVICE/AMC DUE DATE             REMARKS                       DESCRIPTION
    4/25/2025                                     HT INSTALLATION
    4/25/2025                                     TRF INSTALLATION
    4/25/2025                                     LT INSTALLATION
                                                  FIRE NOC
                                                  DG
    4/25/2025
                                                  EXPLOSIVE
                                                  COMPLETION CERTIFICATE
     5/2/2026                                     OCCUPANCY CERTIFICATE
                                                  LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                  JBL0739-IN
                                                  ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                 & TREVELATOR  (25+1)
                                                  E001 to E025 and T001
    9/14/2024                                     CTO WATER
                                                  CTO AIR
    9/15/2024                                     PPL
    5/30/2025                                     IPRSL
    6/2/2025                                      AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
                      5/12/2024                      12/31/2026
                      5/12/2024                      12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                               3
   2     HVAC                                                                                     5
   3     PLUMBING                                                                                 2
   4     Fire Fighting & CCTV System                                                              0
   5     Lift & Escalators                                                                        0
   6     Cleaning (soft services)                                                                 0
   7     OTHERS                                                                                   5
         TOTAL                                                                                   15
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                    Date- 18-08-2024
PREVIOUS READING                DIFF.                           CONSUMED (DIFF*900)
     15884.17                   16.17                                 14553.0
     16056.98                   16.16                                 14544.0
                 860                      860
                 870                      870
                 860                      860
                 860                      860
                 415                      415
                           0
                                         KWH                   0
                                                                                         NOC S
RVICE/AMC DUE DATE             REMARKS                       DESCRIPTION
    4/25/2025                                     HT INSTALLATION
    4/25/2025                                     TRF INSTALLATION
    4/25/2025                                     LT INSTALLATION
                                                  FIRE NOC
                                                  DG
    4/25/2025
                                                  EXPLOSIVE
                                                  COMPLETION CERTIFICATE
     5/2/2026                                     OCCUPANCY CERTIFICATE
                                                  LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                  JBL0739-IN
                                                  ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                 & TREVELATOR  (25+1)
                                                  E001 to E025 and T001
    9/14/2024                                     CTO WATER
                                                  CTO AIR
    9/15/2024                                     PPL
    5/30/2025                                     IPRSL
    6/2/2025                                      AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
                      5/12/2024                      12/31/2026
                      5/12/2024                      12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                               0
   2     HVAC                                                                                     3
   3     PLUMBING                                                                                 1
   4     Fire Fighting & CCTV System                                                              0
   5     Lift & Escalators                                                                        0
   6     Cleaning (soft services)                                                                 0
   7     OTHERS                                                                                   5
         TOTAL                                                                                    9
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                    Date- 19-08-2024
PREVIOUS READING                DIFF.                           CONSUMED (DIFF*900)
     15900.34                   13.94                                 12546.0
     16073.14                   14.23                                 12807.0
                 860                      860
                 870                      870
                 860                      860
                 860                      860
                 415                      415
                           0
                                         KWH                   0
                                                                                         NOC S
RVICE/AMC DUE DATE             REMARKS                       DESCRIPTION
    4/25/2025                                     HT INSTALLATION
    4/25/2025                                     TRF INSTALLATION
    4/25/2025                                     LT INSTALLATION
                                                  FIRE NOC
                                                  DG
    4/25/2025
                                                  EXPLOSIVE
                                                  COMPLETION CERTIFICATE
     5/2/2026                                     OCCUPANCY CERTIFICATE
                                                  LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                  JBL0739-IN
                                                  ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                 & TREVELATOR  (25+1)
                                                  E001 to E025 and T001
    9/14/2024                                     CTO WATER
                                                  CTO AIR
    9/15/2024                                     PPL
    5/30/2025                                     IPRSL
    6/2/2025                                      AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
                      5/12/2024                      12/31/2026
                      5/12/2024                      12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                               3
   2     HVAC                                                                                     3
   3     PLUMBING                                                                                 5
   4     Fire Fighting & CCTV System                                                              0
   5     Lift & Escalators                                                                        0
   6     Cleaning (soft services)                                                                 2
   7     OTHERS                                                                                   6
         TOTAL                                                                                   19
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                    Date- 20-08-2024
PREVIOUS READING                DIFF.                           CONSUMED (DIFF*900)
     15914.28                   16.59                                 14931.0
     16087.37                   15.13                                 13617.0
                 860                      860
                 870                      870
                 860                      860
                 860                      860
                 415                      415
                           0
                                         KWH                   0
                                                                                         NOC S
RVICE/AMC DUE DATE             REMARKS                       DESCRIPTION
    4/25/2025                                     HT INSTALLATION
    4/25/2025                                     TRF INSTALLATION
    4/25/2025                                     LT INSTALLATION
                                                  FIRE NOC
                                                  DG
    4/25/2025
                                                  EXPLOSIVE
                                                  COMPLETION CERTIFICATE
     5/2/2026                                     OCCUPANCY CERTIFICATE
                                                  LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                  JBL0739-IN
                                                  ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                 & TREVELATOR  (25+1)
                                                  E001 to E025 and T001
    9/14/2024                                     CTO WATER
                                                  CTO AIR
    9/15/2024                                     PPL
    5/30/2025                                     IPRSL
    6/2/2025                                      AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
                      5/12/2024                      12/31/2026
                      5/12/2024                      12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                               3
   2     HVAC                                                                                     9
   3     PLUMBING                                                                                 3
   4     Fire Fighting & CCTV System                                                              0
   5     Lift & Escalators                                                                        0
   6     Cleaning (soft services)                                                                 0
   7     OTHERS                                                                                   4
         TOTAL                                                                                   19
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                     Date- 21-08-2024
PREVIOUS READING                 DIFF.                           CONSUMED (DIFF*900)
     15930.87                    13.28                                 11952.0
     16102.50                    14.91                                 13419.0
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                             B CHECK
        CUMULATIVE
                                   DONE                     DUE
              HRS.
             0:30:00
            00;30;00             9/15/2023               9/15/2024
            00;30;00             5/30/2024               5/30/2025
            00;30;00             6/2/2024                 6/2/2025
                                 4/6/2024                 4/6/2025
                       NOC STATUS
                         DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                          9/24/2023                      9/23/2026
                          9/20/2022                      9/20/2025
                              No
                         31--08-2019                      One time
                          10/5/2021                       One time
                          5/12/2024                      12/31/2026
                          5/12/2024                      12/31/2026
                             N/A
                             N/A
                          9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                               2
   2     HVAC                                                                                     7
   3     PLUMBING                                                                                 8
   4     Fire Fighting & CCTV System                                                              0
   5     Lift & Escalators                                                                        0
   6     Cleaning (soft services)                                                                 0
   7     OTHERS                                                                                   8
         TOTAL                                                                                   25
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                    Date- 22-08-2024
PREVIOUS READING                DIFF.                           CONSUMED (DIFF*900)
     15944.15                   12.56                                 11304.0
     16117.41                   10.65                                  9585.0
                 800                      800
                 820                      820
                 840                      840
                 840                      840
                 415                      415
                           0
                                         KWH                   0
                                                                                         NOC S
RVICE/AMC DUE DATE             REMARKS                       DESCRIPTION
    4/25/2025                                     HT INSTALLATION
    4/25/2025                                     TRF INSTALLATION
    4/25/2025                                     LT INSTALLATION
                                                  FIRE NOC
                                                  DG
    4/25/2025
                                                  EXPLOSIVE
                                                  COMPLETION CERTIFICATE
     5/2/2026                                     OCCUPANCY CERTIFICATE
                                                  LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                  JBL0739-IN
                                                  ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                 & TREVELATOR  (25+1)
                                                  E001 to E025 and T001
    9/14/2024                                     CTO WATER
                                                  CTO AIR
    9/15/2024                                     PPL
    5/30/2025                                     IPRSL
    6/2/2025                                      AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                          B CHECK
         CUMULATIVE
                                DONE                     DUE
             HRS.
                              9/15/2023               9/15/2024
                              5/30/2024               5/30/2025
                              6/2/2024                 6/2/2025
                              4/6/2024                 4/6/2025
                    NOC STATUS
                      DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                       9/24/2023                      9/23/2026
                       9/20/2022                      9/20/2025
                           No
                      31--08-2019                      One time
                       10/5/2021                       One time
                       5/12/2024                      12/31/2026
                       5/12/2024                      12/31/2026
                          N/A
                          N/A
                       9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                                7
   2     HVAC                                                                                      5
   3     PLUMBING                                                                                 13
   4     Fire Fighting & CCTV System                                                               0
   5     Lift & Escalators                                                                         0
   6     Cleaning (soft services)                                                                  0
   7     OTHERS                                                                                    8
         TOTAL                                                                                   33
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                     Date- 23-08-2024
PREVIOUS READING                 DIFF.                           CONSUMED (DIFF*900)
     15956.71                    16.21                                 14589.0
     16128.06                    16.15                                 14535.0
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                            B CHECK
        CUMULATIVE
                                  DONE                     DUE
             HRS.
            0:17:00
            0:17:00             9/15/2023               9/15/2024
            0:17:00             5/30/2024               5/30/2025
            0:17:00             6/2/2024                 6/2/2025
                                4/6/2024                 4/6/2025
                      NOC STATUS
                        DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                         9/24/2023                      9/23/2026
                         9/20/2022                      9/20/2025
                             No
                        31--08-2019                      One time
                         10/5/2021                       One time
                         5/12/2024                      12/31/2026
                         5/12/2024                      12/31/2026
                            N/A
                            N/A
                         9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                                3
   2     HVAC                                                                                      5
   3     PLUMBING                                                                                 22
   4     Fire Fighting & CCTV System                                                               0
   5     Lift & Escalators                                                                         0
   6     Cleaning (soft services)                                                                  0
   7     OTHERS                                                                                    5
         TOTAL                                                                                   35
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                    Date- 24-08-2024
PREVIOUS READING                DIFF.                           CONSUMED (DIFF*900)
     15972.92                   18.13                                 16317.0
     16144.21                   20.33                                 18297.0
                 770                      770
                 790                      790
                 810                      810
                 810                      810
                 415                      415
                           0
                                         KWH                   0
                                                                                         NOC S
RVICE/AMC DUE DATE             REMARKS                       DESCRIPTION
    4/25/2025                                     HT INSTALLATION
    4/25/2025                                     TRF INSTALLATION
    4/25/2025                                     LT INSTALLATION
                                                  FIRE NOC
                                                  DG
    4/25/2025
                                                  EXPLOSIVE
                                                  COMPLETION CERTIFICATE
     5/2/2026                                     OCCUPANCY CERTIFICATE
                                                  LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                  JBL0739-IN
                                                  ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                 & TREVELATOR  (25+1)
                                                  E001 to E025 and T001
    9/14/2024                                     CTO WATER
                                                  CTO AIR
    9/15/2024                                     PPL
    5/30/2025                                     IPRSL
    6/2/2025                                      AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
                      5/12/2024                      12/31/2026
                      5/12/2024                      12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                            AMC STATUS
 S.No.                                     SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                              4/25/2024                  4/25/2025
   2     LT BREAKERS                              4/25/2024                  4/25/2025
   3     PLC PANEL                                4/25/2024                  4/25/2025
  4      TRANSFORMER-1                          Under warranty
  5      TRANSFORMER-2                          Under warranty
   6     TRANSFORMER-3                            4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                     5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR                 01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                               9/15/2023                 9/14/2024
                 770                            770
                 790                            790
                 810                            810
                 810                            810
                 415                            415
                               0
                                               KWH                      0
                                                                                                  NOC S
RVICE/AMC DUE DATE                 REMARKS                            DESCRIPTION
    4/25/2025                                              HT INSTALLATION
    4/25/2025                                              TRF INSTALLATION
    4/25/2025                                              LT INSTALLATION
                                                           FIRE NOC
                                                           DG
    4/25/2025
                                                           EXPLOSIVE
                                                           COMPLETION CERTIFICATE
     5/2/2026                                              OCCUPANCY CERTIFICATE
                                                           LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                           JBL0739-IN
                                                           ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                          & TREVELATOR  (25+1)
                                                           E001 to E025 and T001
    9/14/2024                                              CTO WATER
                        After the battery was stolen, a new
                                                            CTO AIR
                               battery has been fixed.
    9/15/2024                                              PPL
    5/30/2025                                              IPRSL
    6/2/2025                                               AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
5/12/2024 12/31/2026
5/12/2024 12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
                                             REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                               3
   2     HVAC                                                                                     6
   3     PLUMBING                                                                                 4
   4     Fire Fighting & CCTV System                                                              0
   5     Lift & Escalators                                                                        0
   6     Cleaning (soft services)                                                                 0
   7     OTHERS                                                                                   5
         TOTAL                                                                                   18
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                           Date- 26-08-2024
PREVIOUS READING                      DIFF.                              CONSUMED (DIFF*900)
     16006.93                         15.31                                    13779.0
     16180.49                         15.40                                    13860.0
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                            B CHECK
        CUMULATIVE
                                  DONE                     DUE
             HRS.
            0:20:00
            0:20:00             9/15/2023               9/15/2024
            0:20:00             5/30/2024               5/30/2025
            0:20:00             6/2/2024                 6/2/2025
                                4/6/2024                 4/6/2025
                      NOC STATUS
                        DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                         9/24/2023                      9/23/2026
                         9/20/2022                      9/20/2025
                             No
                        31--08-2019                      One time
                         10/5/2021                       One time
                         5/12/2024                      12/31/2026
                         5/12/2024                      12/31/2026
                            N/A
                            N/A
                         9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                               5
   2     HVAC                                                                                     7
   3     PLUMBING                                                                                 6
   4     Fire Fighting & CCTV System                                                              0
   5     Lift & Escalators                                                                        0
   6     Cleaning (soft services)                                                                 0
   7     OTHERS                                                                                   4
         TOTAL                                                                                   22
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                           Date- 27-08-2024
PREVIOUS READING                      DIFF.                              CONSUMED (DIFF*900)
     16022.24                         15.00                                    13500.0
     16195.89                         15.08                                    13572.0
                 720                            720
                 765                            765
                 790                            790
                 790                            790
                 415                            415
                               0
                                               KWH                       0
                                                                                                   NOC S
RVICE/AMC DUE DATE                 REMARKS                            DESCRIPTION
    4/25/2025                                              HT INSTALLATION
    4/25/2025                                              TRF INSTALLATION
    4/25/2025                                              LT INSTALLATION
                                                           FIRE NOC
                                                           DG
    4/25/2025
                                                            EXPLOSIVE
                                                            COMPLETION CERTIFICATE
     5/2/2026                                               OCCUPANCY CERTIFICATE
                                                            LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                            JBL0739-IN
                                                            ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                           & TREVELATOR  (25+1)
                                                            E001 to E025 and T001
    9/14/2024                                               CTO WATER
                        After the battery was stolen, a new
                                                            CTO AIR
                               battery has been fixed.
    9/15/2024                                               PPL
    5/30/2025                                               IPRSL
    6/2/2025                                                AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
                      5/12/2024                      12/31/2026
                      5/12/2024                      12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                               4
   2     HVAC                                                                                     6
   3     PLUMBING                                                                                 9
   4     Fire Fighting & CCTV System                                                              0
   5     Lift & Escalators                                                                        0
   6     Cleaning (soft services)                                                                 0
   7     OTHERS                                                                                   8
         TOTAL                                                                                   27
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                           Date- 28-08-2024
PREVIOUS READING                      DIFF.                              CONSUMED (DIFF*900)
     16037.24                         15.07                                    13563.0
     16210.97                         15.14                                    13626.0
                 720                            720
                 765                            765
                 790                            790
                 790                            790
                 415                            415
                               0
                                               KWH                       0
                                                                                                   NOC S
RVICE/AMC DUE DATE                 REMARKS                            DESCRIPTION
    4/25/2025                                              HT INSTALLATION
    4/25/2025                                              TRF INSTALLATION
    4/25/2025                                              LT INSTALLATION
                                                           FIRE NOC
                                                           DG
    4/25/2025
                                                            EXPLOSIVE
                                                            COMPLETION CERTIFICATE
     5/2/2026                                               OCCUPANCY CERTIFICATE
                                                            LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                            JBL0739-IN
                                                            ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                           & TREVELATOR  (25+1)
                                                            E001 to E025 and T001
    9/14/2024                                               CTO WATER
                        After the battery was stolen, a new
                                                            CTO AIR
                               battery has been fixed.
    9/15/2024                                               PPL
    5/30/2025                                               IPRSL
    6/2/2025                                                AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
                      5/12/2024                      12/31/2026
                      5/12/2024                      12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
                                             REMARKS
                                                                          GLD In
                                                                   Galaxy Blue Sa
Daily Site Report
       HT METER                     PRESENT READING                 PREVIOUS READING
          KWH                           16066.30                         16052.31
         KVAH                           16240.16                         16226.11
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                               5
   2     HVAC                                                                                     8
   3     PLUMBING                                                                                 6
   4     Fire Fighting & CCTV System                                                              0
   5     Lift & Escalators                                                                        0
   6     Cleaning (soft services)                                                                 0
   7     OTHERS                                                                                   5
         TOTAL                                                                                   24
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                           Date- 29-08-2024
PREVIOUS READING                      DIFF.                              CONSUMED (DIFF*900)
     16052.31                         13.99                                    12591.0
     16226.11                         14.05                                    12645.0
                 720                            720
                 765                            765
                 790                            790
                 790                            790
                 415                            415
                               0
                                               KWH                       0
                                                                                                   NOC S
RVICE/AMC DUE DATE                 REMARKS                            DESCRIPTION
    4/25/2025                                              HT INSTALLATION
    4/25/2025                                              TRF INSTALLATION
    4/25/2025                                              LT INSTALLATION
                                                           FIRE NOC
                                                           DG
    4/25/2025
                                                            EXPLOSIVE
                                                            COMPLETION CERTIFICATE
     5/2/2026                                               OCCUPANCY CERTIFICATE
                                                            LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                            JBL0739-IN
                                                            ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                           & TREVELATOR  (25+1)
                                                            E001 to E025 and T001
    9/14/2024                                               CTO WATER
                        After the battery was stolen, a new
                                                            CTO AIR
                               battery has been fixed.
    9/15/2024                                               PPL
    5/30/2025                                               IPRSL
    6/2/2025                                                AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
                      5/12/2024                      12/31/2026
                      5/12/2024                      12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                               5
   2     HVAC                                                                                     8
   3     PLUMBING                                                                                 6
   4     Fire Fighting & CCTV System                                                              0
   5     Lift & Escalators                                                                        0
   6     Cleaning (soft services)                                                                 0
   7     OTHERS                                                                                   5
         TOTAL                                                                                   24
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                           Date- 30-08-2024
PREVIOUS READING                      DIFF.                              CONSUMED (DIFF*900)
     16066.30                         15.59                                    14031.0
     16240.16                         15.65                                    14085.0
                 720                            720
                 765                            765
                 790                            790
                 790                            790
                 415                            415
                               0
                                               KWH                       0
                                                                                                   NOC S
RVICE/AMC DUE DATE                 REMARKS                            DESCRIPTION
    4/25/2025                                              HT INSTALLATION
    4/25/2025                                              TRF INSTALLATION
    4/25/2025                                              LT INSTALLATION
                                                           FIRE NOC
                                                           DG
    4/25/2025
                                                            EXPLOSIVE
                                                            COMPLETION CERTIFICATE
     5/2/2026                                               OCCUPANCY CERTIFICATE
                                                            LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                            JBL0739-IN
                                                            ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                           & TREVELATOR  (25+1)
                                                            E001 to E025 and T001
    9/14/2024                                               CTO WATER
                        After the battery was stolen, a new
                                                            CTO AIR
                               battery has been fixed.
    9/15/2024                                               PPL
    5/30/2025                                               IPRSL
    6/2/2025                                                AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
                      5/12/2024                      12/31/2026
                      5/12/2024                      12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)
                                                        AMC STATUS
 S.No.                                 SERVICE/AMC DONE DATE       SERVICE/AMC DUE DATE
   1     HT BREAKERS                          4/25/2024                  4/25/2025
   2     LT BREAKERS                          4/25/2024                  4/25/2025
   3     PLC PANEL                            4/25/2024                  4/25/2025
  4      TRANSFORMER-1                      Under warranty
  5      TRANSFORMER-2                      Under warranty
   6     TRANSFORMER-3                        4/25/2024                 4/25/2025
   7     FIRE ALARM PANEL
   8     PA SYSTEM
   9     LIFTS                                 5/3/2024                  5/2/2026
  10     ESCALATORS & TRAVELLATOR             01-01-024                  1/1/2025
  11     CCTV SYSTEM
  12     STP SYSTEM                           9/15/2023                 9/14/2024
  13     DG SET-2 (1500 KVA)                Under warranty
  14     DG SET-3 (1500 KVA)                  9/15/2023                 9/15/2024
  15     DG SET-4 (1500 KVA)                  5/30/2024                 5/30/2025
  16     DG SET-5 (1500 KVA)                  6/2/2024                  6/2/2025
  17     DG SET-6 (500 KVA)                   4/6/2024                   4/6/2025
         PHE PLANTS-1 (6TH FLOOR
  18                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-2 (6TH FLOOR
  19                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-3 (6TH FLOOR
  20                                             N/A                        N/A
         PHASE-1)
         PHE PLANTS-1 (6TH FLOOR
  21                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-2(6TH FLOOR
  22                                             N/A                        N/A
         PHASE-2)
         PHE PLANTS-1 (9TH FLOOR
  23                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-2 (9TH FLOOR
  24                                             N/A                        N/A
         PHASE-3)
         PHE PLANTS-1 (21TH FLOOR
  25                                                       N/A                                   N/A
         PHASE-2)
         PHE PLANTS-2 (21TH FLOOR
  26                                                       N/A                                   N/A
         PHASE-2)
         UPS SYSTEM (1-3) (Emergency
  27                                                    3/28/2024                             3/28/2025
         power supply)
  28     UPS SYSTEM (1) CCTV ROOM                       5/1/2024                              5/1/2025
  29     PREPAID METERING SYSTEM
  30     VRV UNITS -1 -2 (Voltas)                         N/A
  31     VRV UNITS -1-4 (Daikin)                       1/31/2024                              1/31/2025
  32     Multi stack parking system(1-60)            Under warranty
         FIRE HYDRANT DIESEL DRIVEN
  33                                                  15--04-2024                             10/15/2024
         PUMP-1
         FIRE SPRIKLER DIESEL DRIVEN
  34                                                  15--04-2024                             10/15/2024
         PUMP-2
         FIRE WATER CURTAIN DIESEL
  35                                                  15--04-2024                             10/15/2024
         DRIVEN PUMP-3
Electro-mechanical Equipments Status
 S.No.   DESCRIPTION                                                                            EQUIPMENT STA
   1     HT/ LT SYSTEM (ACB & VCB)          All system is noramel condition
   2     PLC PANEL                          auto mode
   3     TRANSFORMERS                       All Working
   4     DG SETS                            All Working But New DG-02, Only Manual mode Running
   5     COOLING TOWERS (DG Sets)           All ok
   6     PHE PLANTS                         All ok
   7     COOLING TOWERS (PHE Plants)        All ok
   8     WATER SUPPLY SYSTEM
   9     CCTV SYSTEM                        All ok
  10     WTP SYSTEM                         One pump is under breakdown
  11     STP SYSTEM                         All ok
  12     OWC SYSTEM                         All ok
  13     LIFTS                              All lift working but some lift Lop not working.
  14     ESCALATOR & TRAVELLATOR            1 nos Escalator no working du to materiel issu
  15     FIRE ALRAM PANEL                   All ok
  16     FIRE FIGHTING SYSTEM               Manual mode
  17     PA SYSTEM                          ok
  18     UPS & INVERTER SYSTEM              ok
COMPLAINT STATUS
 S.No.                            DESCRIPTION                                                    QTY
   1     ELECTRICAL                                                                               8
   2     HVAC                                                                                     3
   3     PLUMBING                                                                                 7
   4     Fire Fighting & CCTV System                                                              0
   5     Lift & Escalators                                                                        0
   6     Cleaning (soft services)                                                                 0
   7     OTHERS                                                                                   7
         TOTAL                                                                                   25
       GLD Infraprojects Private Limited
Galaxy Blue Sapphire Plaza Greater Noida
                                           Date- 31-08-2024
PREVIOUS READING                      DIFF.                              CONSUMED (DIFF*900)
     16081.89                         16.56                                    14904.0
     16255.81                         16.65                                    14985.0
                 720                            720
                 765                            765
                 790                            790
                 790                            790
                 415                            415
                               0
                                               KWH                       0
                                                                                                   NOC S
RVICE/AMC DUE DATE                 REMARKS                            DESCRIPTION
    4/25/2025                                              HT INSTALLATION
    4/25/2025                                              TRF INSTALLATION
    4/25/2025                                              LT INSTALLATION
                                                           FIRE NOC
                                                           DG
    4/25/2025
                                                            EXPLOSIVE
                                                            COMPLETION CERTIFICATE
     5/2/2026                                               OCCUPANCY CERTIFICATE
                                                            LIFTS ( 12 Nos.) JBL0730-IN TO
     1/1/2025
                                                            JBL0739-IN
                                                            ESCALATORS  , JBL0743-IN & JBL744-IN
                                                                           & TREVELATOR  (25+1)
                                                            E001 to E025 and T001
    9/14/2024                                               CTO WATER
                        After the battery was stolen, a new
                                                            CTO AIR
                               battery has been fixed.
    9/15/2024                                               PPL
    5/30/2025                                               IPRSL
    6/2/2025                                                AVIATION LIGHT
     4/6/2025
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
       N/A
          N/A
          N/A
       3/28/2025
       5/1/2025
1/31/2025
      10/15/2024
      10/15/2024
      10/15/2024
                                         B CHECK
        CUMULATIVE
                               DONE                     DUE
            HRS.
                             9/15/2023               9/15/2024
                             5/30/2024               5/30/2025
                             6/2/2024                 6/2/2025
                             4/6/2024                 4/6/2025
                   NOC STATUS
                     DONE DATE                       DUE DATE
3/22/2024 3/22/2027
                      9/24/2023                      9/23/2026
                      9/20/2022                      9/20/2025
                          No
                     31--08-2019                      One time
                      10/5/2021                       One time
                      5/12/2024                      12/31/2026
                      5/12/2024                      12/31/2026
                         N/A
                         N/A
                      9/27/2021                      8/15/2024
                        ACTION TAKEN                                           REMARKS
ularly following with vendors for new LOP required./ RS-4, lift not working.
REMARKS
AC plant ...
 moter number 2 jaam
C plant phase 2....
 ry motor number 1 coupling damaj   (Work done pump working condition)