0% found this document useful (0 votes)
16 views1 page

S Curve

Uploaded by

ronulfo fabula
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views1 page

S Curve

Uploaded by

ronulfo fabula
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Republic of the Philippines

Province of Eastern Samar

Office of the Provincial Engineer

GHANNT CHART AND S-CURVE

Project Title: Construction of Farm-to-Market Road in Llorente, Eastern Samar Phase-2

Project Location: Llorente, Eastern Samar

Duration (Calendar
MONTH 1 MONTH 2 MONTH 3

Days)
Item no. Description Qty. Unit Weight Total Cost WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 1 WEEK 2 WEEK 3 WEEK 4

1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6

B.5 Project Billboard/ Sign Board 1.00 each 0.13% 1 24,425.17 1

Occupational Safety and Health


B.7 3.93 month 0.18% 1 34,303.87 1
Program

B.9 MobilizationDemobilization 1.00 l.s. 0.79% 1 152,318.92 1

B.8(1) Traffic Management 3.93 month 0.74% 1 142,784.18 1

100(1) Clearing and Grubbing 0.68 ha 0.80% 2 154,748.23 1 1

Roadway Excavation (Surplus


102(2)a 12,757.46 cu.m. 13.12% 27 2,527,447.50 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Common)

104(1)a Embankment (from Borrow) 589.38 cu.m. 5.58% 2 1,075,280.98 1 1 1 1 1 1 1

Subgrade Preparation (Common


105(1) 4,843.98 sq.m. 0.58% 3 112,361.92 1 1
Material)

201 Aggregate Base Course 726.60 cu.m 11.84% 2 2,280,500.32 1

PCC Pavement(Plain)- Conventional


311(1)a.2 4,843.98 sq.m. 56.73% 14 10,927,756.31 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Method, 200 mm thk
Reinforcing Street Bar, Grade 40
404 3,792.59 kg 1.99% 4 382,392.84 1 1 1 1 1 1 1 1 1 1 1 1 1
(Minor Structures)

505(5) Grouted Riprap (Class A) 233.38 cu.m. 7.52% 24 1,447,911.29 1 1 1 1 1 1 1 1 1 1


# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
Total 100% 19,262,231.52 # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #

PROJECTED WEEKLY ACCOMPLISH (%) 4.58% 2.92% 2.92% 16.75% 21.26% 24.31% 24.31% 6.53% 2.98% 2.25% 1.88% 0.00%

ACCUMULATED WEEKLY PROJECTED ACCOMPLISHMENT (%) 4.58% 7.50% 10.42% 27.16% 48.42% 72.73% 97.05% 103.58% 106.56% 108.80% 110.68% 110.68%

PROJECTED WEEKLY DISBURSEMENT (₱) 883,017.03 561,655.00 561,655.00 3,225,842.94 4,094,460.66 4,683,324.13 4,683,324.13 1,258,545.07 573,589.25 432,514.97 361,977.82 -

ACCUMULATED PROJECTED PROJECTED ACCOMPLISH (₱) 883,017.03 1,444,672.03 2,006,327.04 5,232,169.98 9,326,630.64 14,009,954.77 18,693,278.91 19,951,823.97 20,525,413.23 20,957,928.19 21,319,906.02 21,319,906.02

Prepared by: Checked by: Recommending Approval:

RONULFO M. FABULA JR. RCE, RMP Engr. GODOFREDO C. ESCOTO Engr. SIXTO A. LIMBAUAN JR.

C and M Gen. Foreman Assistant Provincial Engineer Provincial Engineer