    No.         Reference                           Question                          UNRA's Response
    1         Part           1-   1) ls the extended amount the result of        1.   Yes.
              Bidding                multiplying the nominal quantity and
              Procedures:    the basic hourly rental rate?
              Schedule of 2) ls the quantity of the nominal quantity             2. The Nominal quantity shall
              Day   work     filled in according to the quantity                    be as provided in Series
              Rates:   3.    given in series 8000 of the BOQ?                         8000 of the BOQ.
              Contractor's
              Equipment           3) Can the basic hourly rental rate be         3.   Yes.
              (Pe8)                  considered to include all overhead,
                                profit and administrative costs related
                                to the use of such equipment?
              Part 1-Bidding When providing a grand summary that The grand summary that is
              Procedures:    exclusive       of
                                              upgrading        of
                                                               Ochero- exclusive of Upgrading of Ochero-
t'            GRAND          Akampala    road-16.6km,  do we need to Akampala road-16.6km shall be in
              SUMMARY        BOQ list of series 1000 to 10000 accordance to the table provided
              (EXCLUSIVE     corresponding to grand summary table under Section lV: Bidding Forms;
              OF             excluding the Ochero-Akampala road- Grand Summary (Exclusive of
          I
              UPGRADING      16.6km?                                    Ochero-Akampala Road-'16.6Km)
              OF OCHERO-                                                Page 103. of the issued Bidding
              AKAMPALA                                                  Documents.
              ROAD-
              16.6KM)
              (P103)
          I
    3                             We kindly request you to clarify bellow NO.
                                  issue regarding
lltl
                                  Civil Works for the Upgrading of Katine-
                                  Ochero Road (69.3Kms) including the
                                  construction      of Town Roads        in
                                  Kaberamaido       and Kalaki Towns to
                                  Bituminous Standard:
                                  According to the Bidding documents
                                  each bidder must submit the DBST
                                  Surfacing works. Can Asphalt works be
                                  submitted instead of DBST Surfacing
I                                 Works?
    4                             Please refer to Bid Documents, Pre Bid Please refer          to
                                                                                               the updated
                                  Minutes and Share Point made available drawings in the link below;
l
                                  with Bid information. On all of this, no
                                  drawings regarding this Project have                         Jr"
                                  been made available with the exception htt ps ://1 d ru. m slf/s! ArsW3G Kv K1F
                                                         Page 2 of 9
                                   a(
                                  -+
                             of drawings for typical culverts, typical           icMDSlAt)q0pp Zp A?e=lbAYs8
                             duct marker posts and typical type lll
                             house. ls it possible to have the project
                             drawings (plans, alignment, cross
                             sections, ancillary works) etc.
    5   Section     lX       Part A- Contract Data. Where on the                 Bidders should know that The
        PARTICULAR
                         I
                             Table: Summary of Sections (if any) is              Table of Summary of Sections
        Cond itions          referred that "3    of the len th of the            simply defines a part of the Works
        (Pc)                 road is to be substantia llv com olete and          specified in the Contract Data as a
                         I
                             to be made up of sections of the road as            Section     (ifany) for takeover
                             propos ed bv the Contractor within 180              purposes.
                             davs of the staft of Contract as a ooroved
                                                                                 The 180 days stated are simply the
                             b        En ineer." Please confirm that
                                                                                 required timeframe from the start
                             there is a partial deadline, and if the
                             period of completion is 180 days. Note              of the Contract within which the
                                                                                 Contractor may propose the said
                             that also in the same table is referred
                             that the Time of complelion is 60% of the
                                                                                 sections     for the    Engineer's
                                                                                 approval.
                             time for completion of the whole of the
                             works. Please clarify                               The "60% of the time for
                                                                                 completion of the whole of the
                                                                                 works" is the time for completing
                         I
                                                                                 the Works or a Section (as the
                                                                                 case may be) as stated in the
                         I                                                       Contract Data for         takeover
                                                                                 purposes.
I
                         I
                                                  UpCRRotttC      OF l Detailed Design for Ochero -
I I                      I
                           ocueno- AKAMPALA RoAD - lAkampala (16.6km) is expected to
I I                      I t0 0Xm." this serie
                                                has 3 " Provisional I be completed in the first six (06)
I                        I Sums" but no item (s) to allow for I months after commencement and
                                                         profits as a
                         lContractor's overheads and                  ltherefore, detailed drawings
                                                                                                        and
I
                         lpercentage over the Provisional Sums IBOQs shall be
                                                                                            provided  then.
I
I                          as usually is used for Provisional Sums. lBidders should note that the rates
I                          Please clarify                             I
                                                                        for similar work items provided for
                                                                      | the main road BOQ shall apply.
|rl
    7                        The Bill of Quantities (BoQ)   sheet            I
                                                                                 Please refer to only the BOQs in
                             named "ko boq-UNRA original24-03-24"                the issued Bidding Documents and
                             provided in the link                                as amended in Addendum No.1
                                                                             I
                             (https://onedrive. live.com/?aulhkey=o1o2   1
I                            ALSL%SFkVykadgrvs&id=20DF7                  I
                                                   Page 3 of 9
                                            \4
                                     5D6B025486%2151 9297 &cid=20DF7 I
I
                                     5D68025480) does not align with the
                                     BoQ sheet outlined in the hard copy of
I
                                     the Bidding documents (referenced from
I
                                     Page 92 to Page 102), particularly in the
I
I
                                     Grand Summary section. Moreover, it is
I
                                     noted that several sections are missing
I                                    from the provided sheet."
             Daywork                 ln the Grand Summary, there is no Summary of          Specified
             Schedule;               distinct category for 'Specified Provisional Sums in the Bill of
             Daywork                 Provisional Sums,' and the calculation              Quantities   is for   information
             Summary:                base figure (C+D)       of VAT includes             purposes only.
             Summary        of Provisional Sums that typically should be
             Specified         excluded
                                                                                         Please complete the Grand
             Provisional
                                                                                         Summary (P9.102&103) as
                                                                                         provided in the issued Bidding
             Sums     in   the
                                                                                         Documents.
             Biil           of
    I        Q uantities             ln the lower section titled 'Summary of Summary of
                                                                                     I
                                                                                                 Specified
                                     Specified Provisional Sums' within the Provisional Sums in the Bill of
                                 I
                                                                                                      is for
                                 I
                                     Bill of Quantities, there is an entry: 'Total       Quantities            information
                                     for Specified Provisional Sums (carried             purposes only.
                                     forward to Grand Summary (B), p )'
                                     Kindly provide clarification on what is Please complete the Grand
tl
tl
Iro      I
                                     meant by'Grand Summary (B), p ' "
                                     Please provide clarification on the
                                                                             Summary (P9.102&103) as
                                                                             provided in the issued Bidding
                                                                                         Documents.
                                                                                         YES.
                                     distinction between the Daywork
                                     Schedule (referenced from Page 92 to The bidder should
                                                                                            complete the
                                     Page 98) and SERIES 8000: Day work schedule as provided in
                                     DAYWORKS. Should the bidder the Bidding Documents and BOQ.
                                     complete   the Daywork Schedule,
                                     considering it is already included in
                                     SERIES 8000: DAYWORKS of the bill of
                                     quantities?"
    11                               Please confirm whether the quantity in The quantity is confirmed as 125
                                     '56.1 1 Weeding the grass when Ha as is clearly provided in the
                                     established by topsoiling only' is 125 ha BOQs in the issued Bidding
                                     or 25 ha                                  Documents.
                                                             Page 4 of 9
                                                      F<
                                                  \
    12   I
                                  Please confirm whether the service duct Please note that the provision for
                                  diameter for streetlights is 150mm or street lighting is Solar powered
                                  100mm. Additionally, there                      is
                                                                          no lights with no requirement for
                                  payment item for PVC pipes of this service ducts at the light pole
                                  diameter in the Bill of Quantities. Should locations.
                                  the cost of service ducts and their
                                                                             The service ducts provided under
                                  foundations be included in 58.01?"
                                                                             BOQ item 22.23 are for other utility
                                                                             services and the diameter required
                                                                             is 200mm as provided in the BOQ.
                                                                             Please refer                      to
                                                                                                    section 2218
                                                                             (Measurement & Payment) of the
                                                                             "General Specifications for Road and
                                                                             Bridge Works, January 2005" for
                                                                             details of what is included in the bid
                                                                                            rate for service ducts.
    13                            Regarding 66.18 (a) (i)'Number plates at This will be a precast concrete
                                  Box locations,' could you please specify culvert marker post labelled "CU"
                                  the material of the number plates and cast in the ground. As detailed
                                  the method of fixing?                    under Drawing A174/UNRA2008-
                                                                           09-000 1 87 06/0 1 -33/T RC M/00 1
    14       Bill ltem 21   18    Please clarify if the unit is m3 or m2                    The unit of measurement shall be
             Selected                                                                       cubic metre (m3) in line with
             Backfill                                                                       section 2108 (Measurement &
             material under                                                                 Payment) of the           "General
             concrete-lined                                                                 Specifications for Road and Bridge
             side drains                                                                    Works, January 2005"
             compacted to
             92% BS Heavy
             density
    15       Section        lV:   ln the fourth paragraph of form bid     Please note that the text of the Bid
                                  security "this guarantee will expire    Security cannot be changed and
I
             Bidding
                                  (a)..........;and (b)       ", the bank the Bid Security Format cannot be
I
I
             Forms-    Form
             of Bid Security      suggest change the words "and" to "or"  amended as req uested
    16                            ln the fourth paragraph of form of    bid                 The bid security validity shall
                                  security, because there is no any place                   expire as clarified in item 18 of
                                  can write the exactly expire date for the                 clarification No. 4.
                                  bid   security, therefore,          bank   the
         I                        suggests to add the exact expire date or
                                  (c                )               on... (day)        .
                                  (month).   ..   .. . . .   .(year)" on the last of this
                                                                    Page 5 of 9
                                                              BA
                               paragraph
    17                         Considering the volume of the requested           NO further extensions are granted
                               equipmentand to prepare a                         at this time.
                               comprehensive technical and
                               competitive financial proposal, it is kindly
                               requested to examine the possibility of
l                              extending the bid submission deadline
                               for 20 days.
    '18       Section ll:BDS   Sinceit is a little complex to calculate For purposes of clarity;
              tTB 18.1&19.1    the working days, can you kindly
                               consider to revise the ITB 18.1 to "The
                                                                                 ITB 1.2 (c) of the          Bidding
                               bid Validity period shall be              180
                                                                                 Document, "day" means calendar
                               calender days"                                    day unless otherwise specified as
                                                                                 'Business Day". A Business Day is
                                                                                 any day that is an official working
                                                                                 day of the Beneficiary. lt excludes
                                                                                 the Beneficiary's official public
                                                                                 holiday.
                                                                                 ITB 18.1 The bid validity    period
                                                                                 shall be 180 working days. i.e. the
                                                                                 bid shall be valid to a day not
                                                                                 earlier than January 9, 2025
                                                                                 ITB 19.1 The Bid Security shall be
                                                                                 valid for 28 calendar days from
                                                                                 date of bid validity period i.e. the
                                                                                 bid security shall be valid to a
                                                                                 date not earlier than February 6,
                                                                                 2025
Irs       I
                               Please provide the drawings          of   New     Please refer to the Standard Detail
tt                             Jersey Barrier                                    for New Jersey Barrier provided in
          I
                                                                                 the updated link below;
          I
          I
                                                                                 https://1d     ms/f/s !ArZUAmt dcd8 n9
                                                                                              rv.
                                                                                 k Bvwv- RX KR o 2 C u -w
          I
    20                         Kindly clarify if item 45.05 "Precoating          NO
                               second application of aggregate MC-30
                               Cut                                               Please refer       to the      "General
                               Back Bitumen, Unit in Tonnes" of           Bill   Specifications for Road and Bridge
                               No.04, is a duplicate item of 41.0'1 "Prime       Works, January 2005" for fudher
                               Coat                                              details in regards to these ltems.
                               (a) MC-30 cut-back bitumen 1.01/sqm, Unit
                                                      Page 6 of 9
                                           F(
                                       *
         I                                 in Ltr" of the same Bill No.04.                                 I
    21   I                                 Please clarify if the following items include
         I                                 design and build
         I
                       Section 9100:Upgrading of Ochero-Akampala Road
                                                                                                               Ochero-Akampala        Road      is
                                                                                                               expected to be designed within the
                   20.o'l                  Provisional Sum for miscellaneous                                   first 06         months       after
                                           drainage works lo be carried out on
                                           Ochero-Akampala at the direction ol
                                                                                                               commencement. Detailed
                                           the Engineer r                                                      Drawings    and      BOQs shall
                                           Provisional Sum for miscellaneous
                                           earthworks and gravelling, pavement
                                                                                                               therefore   be     provided then.
                   30.01                   layers to be carried oul on Ochero-                                 Bidders should note that the rates
                                           Akampala at the direction of the                                    for similar work items provided for
                                            Engineer                                                           the main road BOQ shall apply.
                                           Provisional Sum for miscellaneous
                                           surfacing works and signage to be
I
I                  40.01
                                           carraed out on Ochero-Akampala at the
                                           direction of the Engineer                                       I
    22           BOQ                       We have found that the quantities of the
                                           following items are significantly beyond
I
                                       I
                                           the normal. Please confirm if                         the
                                                                                                       I
I                                          quantities are correct.                                     I
                  No.               Item                                Unit    Quantity
                                                                                                           IYES.
             I
                  22.03(b)(i)
                                I
                                    600mm diameter                      m            2.400                 |   ftrequantlties are confirmed as
                                                                                                                      in the BOQs in the issued
             f          I ctass tslao concrete in]                              I
                                                                                             I             I nrovideA
                                                                                                             eiaoins Documents.
             I ,r.orr^, I cn." n culvert oeooing, [r.                               a*rl                   I
             |                  |   screeds, haunching and          I
                                                                                                           I
                                    the encasins tor       pipes,
             I                  I
                                    includins    formwork
                                                                    I
             i                  I                                   I
                  23 08(aXi) Concrete Class 25120 to                    m3          8,098
                             inverts
                                    To sides with formwork      o
                                                                                    50,063
                 23.09(b)
                                                   both interni M2                           |
         I
                                                   and externi
                                                   faces (eac
                                                   face
                                                   measured)
                                    Rectangular concrete J                      I
                 ,,                 Drain Covers o. r sm x
                                                       f
                                                                    ]No
                      "'''''        0.5m     x 0.9m: inclusive
                                                                                I
                                                                                I
                                                                                    35.400
                                    of     steel welded mesh                    I
             1                      reinforcement and                           I
                                                                             Page 7 of 9
                                                       k$
                                     haunch ing concrete
             25 0r(bxiia)            Grouted     stone
                                                                1,,        |        4e,254
                                 pitching 250mm thick
             25 02(b)             Dumped riprap                     m3              14,550
     |
             zs oaral                Cast insitu    concrete M3                     ,t,a*
     I                               pitching (C30 Cast-insitu
                                     concrete and      '100mm   I
     I
                                     thick)                                                  |
             25.05               lConcrete edge beams           M3                  4,152
                                 I rczsrzot
                        tat Garvanized
                                                                                             I
             sz ot
23
         I                       I      l"    I   a,sso
         Please provide quantity for the following laboratory
                                                                                    r
                                                                                             l
         equ ipment;
                                                       Penetration                                                        of    Bituminous
         Table -C1410/5: EQUIPMENT AND APPARATUS TO BE Materials
         PROVIDED FOR THE ENGINEER'S MOBILE No. lt
         LABORATORY
                                                         m
                       Penetration of Bituminous Materials
               No          I   tem                                        Ouantity
                   1            Bitumen                Penetrometer missing                               Bitumen                   1No
                                (Automatic and Hand Operated)                                                                       Automatic
                                                                                                          Penetrometer
                                                                                                                                    Bitumen
                                                                                                          (Automatic           and penelrom
                   2            Containers-Metal         or     glass missing                                                       eter
                                                                                                          Hand Operated)
                                cylindrical flat bottom (tin boxes)                              ll                                 should be
                                                                                                                                    SU     ied.
                                90ml capacity
                                                                                                      2   Containers-Metal or p3
                   3            Water Bath                                missing                         glass cylindrical flat
                4               Transfer dish for container               mrssrng                         bottom (tin boxes)
                                                                                                           0ml capacity
                               Thermometers for water         bath        missing
                                                                                                      3   Water Bath                01
               6               Stopwatch or electric timer                mrssrng
                                                                                                      4 Tran sfer      dish     for01
               7               Heater-oven or hot plate                   mrssrn9                          ontainer
                                                                                                      5 ;fhermometers           for01
                   Time of Setting of Hydraulic Cement                                                    water bath
                                                                                                      6   Stopwatch or electricPl
               1               Scales                                                                     timer
                                                                          lrnissins
                                                                                                      7   Heater-oven or hoto'l
               2               Glass Graduate     -   200m1 or 250m1        rssrng                         late
                               capacity
                                                                                                      Time of Setting          of   Hydrauli
                Miscellaneous                                                                         Cement
                                                                         Page   I   of 9
                                                         s
     Sample Bags (number of bags                    cales                 efers
     be su    ied as   uired                                                set
                                                                           ights
   2 Plastic Tubing for Vacuum Line,
                                                                         scales)
     meter
                                                                          at
Consumables                                                              upplied
      Additional consumables to                                          lass
       rovided as re uired        '"1                                     raduate
                                                                               200m1
                                                                         50
                                                                         a ct
                                                    lass      Graduate  efer to
                                                    00ml       or 250m mmediat
                                                     pacity
                                                                              ponse
                                                                         n         (1
                                                                         bove
                                                Miscellaneous
                                                    ample          Bag       upplied
                                                   number    of bags     s
                                                          supplied   a         uired
                                                      uired
                                                    lastic Tubing   fo       upplied
                                                    acuum Line, meter    SA set
                                                                                       its
                                                                             bing for
                                                                             cuum
                                                                         tne
                                                Consumables
                                                   Additional                upplied
                                                   consumables to        S
                                                   provided       a            uired
                                                      uired