Level Inspection16 31

The document reports on issues found with room control units (RCUs) during an inspection of levels 16-31 of a building. Many RCU boxes were found to be sunk into or embossed from walls and would require reinstallation or filling of openings. Several rooms had obstacles like concrete beams that would make future RCU access difficult. Some panels required longer screws due to depth and orientation issues. The presidential suite was also noted to require more space for its RCU panel.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views10 pages

Level Inspection16 31

The document reports on issues found with room control units (RCUs) during an inspection of levels 16-31 of a building. Many RCU boxes were found to be sunk into or embossed from walls and would require reinstallation or filling of openings. Several rooms had obstacles like concrete beams that would make future RCU access difficult. Some panels required longer screws due to depth and orientation issues. The presidential suite was also noted to require more space for its RCU panel.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 10

GHC RCU related problems.20.04.

2018

For Level16-31 cable laying is not completed .Thus location issues only
considered for this inspection.
Level 16
Room 14
RC-02 thermostat too deep required long screw.

Level 17
Room 06
RC-12 Sunk box embossed from wall.
Room 16
RC-12 Sunk box embossed from wall.
Room 17
RC-02 Sunk box embossed from wall.

Level 18
Room 03
RC-02 Sunk box embossed from wall.
Room 04
RC-12 Sunk box embossed from wall.
Room 05
RC-12 Sunk box embossed from wall.
Room 07
RC-12 Sunk box damaged need to reinstall.
Room 08
RC-12 Sunk box embossed from wall.
Room 09
RC-14 Sunk box must fill box opening.
Room 10
RC-17 Sunk box embossed from wall.
GHC RCU related problems.20.04.2018

Room 13
RC-02 Sunk box must fill box opening.
RC-12 Sunk box must fill box opening.
Room 14
RC-12 Sunk box must fill box opening.
Room 16
RC-12 Sunk box embossed from wall.

Level 19
Room 01
RC-12 entry panel too deep required long screw.
Room 02
RC-02 Sunk box must fill box opening.
Room 03
RC-12 Sunk box must fill box opening.
Room 08
RC-12 entry panel too deep required long screw.
Room 10
RC-02 Sunk box must fill box opening.
RC-12 Sunk box must fill box opening.
RC-17 Sunk box must fill box opening.
RC-14 Sunk box must fill box opening.
RC-18 Sunk box embossed from wall.

Room 12
RC-12 Sunk box embossed from wall.
GHC RCU related problems.20.04.2018

Level 20
Room 13
RC-02 Sunk box embossed from wall.
Room 14
RC-02 Sunk box embossed from wall.

Level 21
Room 1-2
RC-12 entry panel too deep required long screw.
Room 05
RC-02 Sunk box embossed from wall.
Room 17-18
RC-12 entry panel too deep required long screw

Level 22
Room 1-2
RC-13 Sunk box must fill box opening.
Room 04
RC-12 Sunk box must fill box opening.
Room 05
RC-12 Sunk box must fill box opening.
Room 08
RC-12 Sunk box embossed from wall.
Room 09
RC-17 Sunk box must fill box opening.
Room 10
RC-13 Sunk box embossed from wall.
Room 12
RC-12 Sunk box embossed from wall.
GHC RCU related problems.20.04.2018

RC-02 Sunk box embossed from wall.


Room 14
RC-02 Sunk box embossed from wall.
Room 16-17
RC-12 too deep required long screw.
Room 19
RC-12 Missing.
RC-02 not installed
Room 20
RC-02 not installed

Level 23
Room 01
RC-13 Sunk box must fill box opening.
Room 03
RC-12 Sunk box embossed from wall.
Room 04
RC-02 Sunk box embossed from wall.
Room 06
RC-02 Not installed properly.
Room 09
RC-18 Sunk box must fill box opening.
Room 10
RC-02 Sunk box must fill box opening.
RC-12 Sunk box must fill box opening.
Room 14
RC-02 Sunk box embossed from wall.
Room 15
RC-02 Sunk box must fill box opening.
GHC RCU related problems.20.04.2018

Room 16
RC-02 Sunk box must fill box opening.
RC-12 Sunk box must fill box opening.
Room 17-18
RC-12 too deep required long screw.
Room 12
RC-12 Sunk box must fill box opening.

Level 24
Room 1-2
RC-12 too deep required long screw.
Room 04
RC-02 Sunk box embossed from wall.

Level 25
Room 1-2 and 17-18
RCU location not finalized.
Room 04
RC-12 Sunk box missing.
Room 07
RC-02 Sunk box embossed from wall.
Room 09
RC-12 Sunk box embossed from wall.
Room 14
RC-02 too deep required long screw.

Level 26
Room 1-2 and 17-18
RCU location not finalized.
Room 03
RC-12 Sunk box must fill box opening.
Room 04
GHC RCU related problems.20.04.2018

RC-12 Sunk box must fill box opening.


RC-02 Sunk box must fill box opening.

Room 07
RC-02 Sunk box must fill box opening.
RC-12 Sunk box must fill box opening.

Room 09
RC-12 Sunk box must fill box opening.
RC-14 too deep required long screw.
RC-17 too deep required long screw.

Room 10
RC-18 Sunk box must fill box opening.
Room 12
RC-02 Sunk box embossed from wall.
Room 13
RC-02 Sunk box embossed from wall.
RC-12 Sunk box embossed from wall.
Room 14
RC-02 Sunk box embossed from wall.
Room 15
RC-02 Sunk box embossed from wall.
RC-12 Sunk box embossed from wall.
Room 16
RC-12 Sunk box embossed from wall.
GHC RCU related problems.20.04.2018

Level 27
Room 01
RC-12 Sunk box embossed from wall.
Room 03
RC-02 Sunk box must fill box opening.
Room 04
RC-02 Sunk box must fill box opening.
Room 05
RC-12 Sunk box must fill box opening.
Room 06
RC-02 Sunk box must fill box opening.
Room 07-08
RCU not finalized
RC-02 Sunk box must fill box opening.
Powder room panel not finished.
Room 13
RC-02 Sunk box embossed from wall.
Room 16
Due to presence of concrete beam accessing the RCU location will be difficult after celling
completed.
Room 17-08
RC-12 Sunk box embossed from wall.

Level 28
Room 05
RC-02 Sunk box embossed from wall.
Room 07-09 and 10-11
RCU not finalized
Room 15
RC-02 Sunk box embossed from wall.
GHC RCU related problems.20.04.2018

Level 29
Room 02
RC-02 Sunk box embossed from wall.
Room 07-10 and 17-20
RCU not finalized
Room 12
RC-02 Sunk box embossed from wall.

Level 30
Room 05
RC-02 Sunk box embossed from wall.
Room 06
RC-02 Sunk box must fill box opening.
Room 07
RC-02 Sunk box embossed from wall.
RC-12 Sunk box must fill box opening.
Room 09
RC-12 too deep required long screw.
RC-14 powder room panel Sunk box must fill box opening.
RC-18 too deep required long screw.
Room 10
RC-12 Sunk box must fill box opening.
RC-17 Sunk box must fill box opening.
Room 12
RC-02 Sunk box must fill box opening.
RC-12 Sunk box must fill box opening.
Room 13
Cable trunking blocking the RCU
GHC RCU related problems.20.04.2018

Room 14
RC-12 Sunk box must fill box opening.
Room 16
RC-02 Sunk box embossed from wall.

Level 31
Room 03
Due to presence of concrete beam, accessing the RCU location will be difficult after celling
completed.
Room 04
RC-02 Sunk box embossed from wall.
Room 05
RC-02 Sunk box embossed from wall.
Room 06
RC-02 Sunk box embossed from wall.
RC-12 Sunk box embossed from wall.
Room 07
RCU panel need to finalize. Require more area for RCU panel.
Room 12
RC-02 Sunk box embossed from wall.
Room 13
RC-02 Sunk box embossed from wall.
Room 14
RC-12 Sunk box must fill box opening.
Room 15
RC-12 Sunk box damaged need to reinstall.
Room 16
RC-02 Sunk box must fill box opening.
Room 17
RC-02 Sunk box must fill box opening.
GHC RCU related problems.20.04.2018

Note:-
 For all bathrooms and powder room panels required longer screws.
 Two column Lutron keypad required sunk box screws installed at
vertical orientation as follows,

 Presidential suite required more area for RCU.