Cable Testing Procedure
1. Check at the panel box
 2. Check wiring connection at the junction box 1
     Volumetric pump (PE1)
     Volumetric pump (PE2)
    Live PE1                                                      Live PE1
 Neutral PE1                                                      Neutral PE1
Earth PE1 & PE2                                                  Earth PE1 & PE2
 Neutral PE2                                                     Neutral PE2
     Live PE2                                                    Live PE2
                             Terminal Connector
 From Panel Box                                              From Instrument
 3. Check wiring connection at the junction box 2
     Temperature Transmitter (TT1)
     Pressure Transmitter 1 (PT1)
     Pressure Transmitter 2 (PT2)
       +Ve TT1                                                                    +Ve TT1
       -Ve TT1                                                                    -Ve TT1
 4mb~20mb TT1                                                                     4mb~20mb TT1
       +Ve PT1                                                                     +Ve PT1
       -Ve PT1                                                                      -Ve PT1
 4mb~20mb PT1                                                                      4mb~20mb PT1
         +Ve PT2                                                                   +Ve PT2
        -Ve PT2                                                                     -Ve PT2
  4mb~20mb PT2                                                                     4mb~20mb PT2
   +Ve MS08                                                                         +Ve MS08
    -Ve MS08
                                                                                     -Ve MS08
                                        Terminal Connector
 From Panel Box                                                                 From Instrument
      4. Check wiring connection at the junction box 3
          Flow Transmitter (FT1)
          Flow Controller (FC1)
                                                                             +Ve FT1
      +Ve FT1
                                                                            -Ve FT1
      -Ve FT1
                                                                            485 Tx FT1
   485 Tx FT1
                                                                           485 Rx FT1
   485 Rx FT1
                                                                           (+)4-20mA FT1
      +Ve FC1                                                              (-)4-20mA FT1
                                                                             +Ve FC1
     -Ve FC1
                                                                             -Ve FC1
(-)4~20mA FC1
                                                                           (-)4~20mA FC1
(+)4~20mA FC1                                                               (+)4~20mA FC1
                                             Terminal Connector
      From Panel Box                                              From Instrument
      5. Check wiring connection at the junction box 4
           Mass Flow Controller 1 (MFC1)
           Mass Flow Controller 2 (MFC2)
     +Ve MFC1                                                             +Ve FT1
     -Ve MFC1                                                             -Ve MFC1
 485 Tx MFC1                                                              485 Tx MFC1
 485 Rx MFC1                                                              485 Rx MFC1
                                                                         Ground MFC1 & MFC2
   +Ve MFC2
                                                                           +Ve MFC2
   -Ve MFC2                                                                 -VeMFC2
485 Tx MFC2                                                                 485 Tx MFC2
485 Rx MFC2                                                                 485 Rx MFC2
                                             Terminal Connector
      From Panel Box                                              From Instrument
      CHECKLIST FOR PANEL BOX
 NO INSTRUMENTS                STATUS
CHECKLIST FOR JUNCTION BOX 1
 NO   CABLE CONNECTIVITY       STATUS
 1    JUNCTION BOX 1
 1    LIVE PE1
 2    NEUTRAL PE1
 3    LIVE PE2
 4    NEUTRAL PE2
 2    JUNCTION BOX 2
 1    +Ve TT1
 2    -Ve TT1
 3    4mb~20mb TT1
 4    +Ve PT1
 5    -Ve PT1
 6    4mb~20mb PT1
 7    +Ve PT2
 8    -Ve PT2
 9    4mb~20mb PT2
 3    JUNCTION BOX 3
 1    +Ve FT1
 2    -Ve FT1
 3    485 Tx FT1
 4    485 Rx FT1
 5    +Ve FC1
 6    -Ve FC1
 7    (-)4~20mA FC1
 8    (+)4~20mA FC1
 4    JUNCTION BOX 4
 1    +Ve MFC1
 2    -Ve MFC1
 3    485 Tx MFC1
 4    485 Rx MFC1
 5    +Ve MFC2
 6    -Ve MFC2
 7    485 Tx MFC2
 8    485 Rx MFC2