Electrical Resistance Soil Corrosion Probe Test Station
Electrical Resistance Soil Corrosion Probe Test Station
NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
NOTES:
1. THE ENCLOSURE SHALL BE IN ACCORDANCE WITH
150 25 MATERIAL SPECIFICATION 17-AMSS-008.
126 22
C 5. FOR MOUNTING SUPPORT DETAILS REFER TO
STANDARD DRAWING AB-036540.
30
6. ALL BRASS HARDWARE SHALL BE 1/4 "-20 MINIMUM
15
SIZE.
25
8. FOR NON-METALLIC BOXES ANY METAL HARDWARE
SHALL BE 300 SERIES STAINLESS STEEL.
#8 STAINLESS STEEL
50
9. IF THE ENCLOSURE IS NOT UL LISTED AND CERTIFIED
6
TO NEMA 4X, THE DESIGN OF THE ENCLOSURE MUST
MOUNTING HARDWARE
BE APPROVED IN WRITTING BY THE RSA FOR
25
CATHODIC PROTECTION MATERIALS.
9 TYP. (5 PLACES)
RETAINING CHAIN
FOR SOCKET CAP
12
CORROSION PROBE 8 7
8
SOCKET CAP ON
CATHODIC PROTECTION
100
ER SOIL CORROSION
A A
OFF
250
200
150
PROBE P/L CONTINUOUS FULL
6 LENGTH HINGE
280
MATERIAL LIST
13 mm ENGRAVED DWG.
12 DESCRIPTION
CODE
LETTERS
4 mm ENGRAVED 1 ENCLOSURE: NEMA 4X; 200 x 250 x 110
15
3 REFERENCE DRAWINGS
1
200 200
170 170
22 126 22 22 126 22
:MHJ:75165
6
1
DWG. RESPONSIBILITY:
CORROSION PROBE 1
CONNECTION CABLE 10
CATHODIC PROTECTION STD. COMMITTEE
INTERNAL WIRING TYP.
70
70
$$SARAMCO-DCC-STAMP$$:714120-1003-05
2
#8AWG (10MM ) SCALE:
CONNECTION WIRE
110
110
TO PIPELINE
REVISION VALIDATION
6
7 DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
11 8 8
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
NONE
CORROSION PROBE
SOCKET
REV.NO. DATE REVISION DESCRIPTION
CATHODIC PROTECTION
TEST STATION-ER SOIL CORROSION PROBE
FOR BURIED PIPELINES
STD. DWG. SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.