Week 10 - Final Demo & Handoff

Open
No due date
•Last updated Nov 8, 2026

Complete the Weeks 9-10 buffer: finish prerequisite fixes, reproduce the integrated demo at a recorded revision, finalize all four design writeups and measured results, and deliver the live or recorded presentation. Keep unfinished Week 7-9 work visible; optional stretch features are not required. Checkpoint: clean setup/build and full local/network demo verified, known limitations and remaining work assigned, all writeups linked.

0% complete