Milestones
List view
Complete the Weeks 9-10 buffer: finish prerequisite fixes, reproduce the integrated demo at a recorded revision, finalize all four design writeups and measured results, and deliver the live or recorded presentation. Keep unfinished Week 7-9 work visible; optional stretch features are not required. Checkpoint: clean setup/build and full local/network demo verified, known limitations and remaining work assigned, all writeups linked.
No due date•0/4 issues closedStart the Weeks 9-10 buffer from the project plan: finish integration and bug fixes after Week 8, rehearse the complete local and two-repository demo, draft each person's design writeup, and select optional stretch work only if time remains. Checkpoint: a teammate can reproduce the demo from a clean setup; all four writeups are drafted; remaining bugs and any selected stretch goal have clear owners and acceptance criteria.
No due date•1/5 issues closedComplete the Weeks 7-8 optimization and polish phase after the Week 6/7 prerequisites: address measured storage, working-tree, history, and network bottlenecks; close CLI/error gaps; publish comparable performance results and current usage docs. Checkpoint: the complete local and two-repository workflow passes across fresh CLI processes, including packed storage, rejected push, persistent conflict resolution, and interruption/retry.
No due date•1/4 issues closedStart the Weeks 7-8 optimization and polish phase: finalize packfile support, improve log/status/diff output, audit shared errors, and record a reproducible performance baseline on a moderately large repository. Checkpoint: the complete CLI and push/pull workflow passes with readable output, preserved failure behavior, and documented measurements for Week 8.
No due date•1/4 issues closed