Skip to content

chore: P0 consolidation — two-plane architecture + content-contract hard gate - #69

Merged
dominicusin merged 1 commit into
mainfrom
chore/p0-stabilization-clean
Aug 15, 2026
Merged

dominicusin merged 1 commit into
mainfrom
chore/p0-stabilization-clean

Conversation

@dominicusin

Copy link
Copy Markdown
Owner

Stabilize after Hugo migration (no site runtime change except stricter publishing contract).

  • Content Contract: new posts in content/blog/ are now a HARD gate (ci-content-contract.cjs splits added=hard vs modified=soft; hugo.yml drops || true). Invalid new post blocks deploy.
  • CI/CD: disable legacy deploy-ipfs.yml (Jekyll + compromised Pinata); security.yml drops Ruby/Jekyll + pins trivy@v0; fix master->main in analytics/security/sync_gists.
  • Docs: AGENTS.md rewritten for Hugo; README CI/CD table + hard-gate wording; new docs/adr/0002-two-plane-architecture.md.

Local: hugo 155 HTML, validate-frontmatter exits 1 on invalid / 0 on valid, ci-content-contract vacuous.

…contract hard gate

Documentation and CI debt cleanup after the Hugo migration (no runtime change
to the shipped site except a stricter publishing contract).

Content Contract (P0 #1/#3):
- scripts/ci-content-contract.cjs: split into ADDED (hard gate, exit 1 on
  invalid new post) vs MODIFIED (report-only) tiers. New publications in
  content/blog/ MUST satisfy schema/post-metadata.schema.json.
- .github/workflows/hugo.yml: drop `|| true` — an invalid new post now blocks
  the Hugo build/deploy (it was only a warning before).

CI/CD consolidation (P0 #2):
- .github/workflows/deploy-ipfs.yml: DISABLED (legacy Jekyll build + compromised
  Pinata credentials; tag pre-phase7-legacy keeps the Jekyll state).
- .github/workflows/security.yml: drop Ruby/Jekyll steps (broken post-Phase-7),
  pin aquasecurity/trivy-action@v0 (was @master).
- Fix stale `master` branch refs -> `main` in analytics.yml, security.yml,
  sync_gists.yml.

Docs:
- AGENTS.md rewritten for the Hugo + Blowfish reality (was describing Jekyll).
- README.md: tests badge, hard-gate wording, explicit CI/CD workflow table
  (single publisher = hugo.yml), link to the new ADR.
- docs/adr/0002-two-plane-architecture.md: formal Publishing vs Engineering
  plane boundary, integration points, DAO lifecycle (separate track).

Local: hugo build 155 HTML, validate-frontmatter exits 1 on invalid / 0 on
valid, ci-content-contract vacuous on no-new-posts, hard gate wired.
@bolt-new-by-stackblitz

Copy link
Copy Markdown

Review PR in StackBlitz Codeflow Run & review this pull request in StackBlitz Codeflow.

@qodo-code-review

Copy link
Copy Markdown

Qodo reviews are paused for this user.

Troubleshooting steps vary by plan Learn more →

On a Teams plan?
Reviews resume once this user has a paid seat and their Git account is linked in Qodo.
Link Git account →

Using GitHub Enterprise Server, GitLab Self-Managed, or Bitbucket Data Center?
These require an Enterprise plan - Contact us
Contact us →

@vercel

vercel Bot commented Aug 15, 2026

Copy link
Copy Markdown
Contributor

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated (UTC)
dominicusin-github-io Building Building Preview Aug 15, 2026 8:13am

@coderabbitai

coderabbitai Bot commented Aug 15, 2026

Copy link
Copy Markdown

Warning

Review limit reached

@dominicusin, you've reached your PR review limit, so we couldn't start this review.

Next review available in: 57 minutes

You've used all free OSS reviews for now. Wait for the free limit to reset to keep reviewing this public repository.

How can I continue?

After more reviews become available, a review can be triggered using the @coderabbitai review command as a PR comment. Alternatively, push new commits to this PR.

To avoid repeated limits, reduce automatic review volume by pausing incremental auto-reviews earlier, using label-based review opt-in, excluding WIP or generated PR titles, or requesting reviews manually when the PR is ready. If your team needs uninterrupted high-volume reviews, an organization admin can enable usage-based reviews.

How do review limits work?

CodeRabbit enforces per-developer PR review limits for each organization. Most developers receive the normal plan review availability.

For paid Pro and Pro+ PR reviews, CodeRabbit uses adaptive limits for sustained high-volume activity. When a developer's recent PR review activity reaches the 95th percentile or higher among CodeRabbit users, additional reviews become available more gradually as earlier reviews age out of the rolling window.

Please refer docs for additional details.

Review details
⚙️ Run configuration

Configuration used: Organization UI

Review profile: CHILL

Plan: Pro Plus

Run ID: 24976ed6-9252-4ab0-910c-74ed91e4420c

📥 Commits

Reviewing files that changed from the base of the PR and between 32987e3 and 4100599.

📒 Files selected for processing (9)
  • .github/workflows/analytics.yml
  • .github/workflows/deploy-ipfs.yml
  • .github/workflows/hugo.yml
  • .github/workflows/security.yml
  • .github/workflows/sync_gists.yml
  • AGENTS.md
  • README.md
  • docs/adr/0002-two-plane-architecture.md
  • scripts/ci-content-contract.cjs

Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out.

❤️ Share

Comment @coderabbitai help to get the list of available commands.

@dominicusin
dominicusin merged commit 871527a into main Aug 15, 2026
8 of 12 checks passed
@dominicusin
dominicusin deleted the chore/p0-stabilization-clean branch August 15, 2026 08:13

This branch was previously deployed

1 inactive deployment
Preview — 41005992 Deployed Aug 15, 2026 by vercel[bot]
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant