HSE Observation Report: Safety Issues

The HSE observation report details 6 issues found at various locations on site. It notes that an unqualified carpenter was erecting scaffolding, electrical boxes were installed without cable glands, and power tools were being used without plugs. It recommends only allowing qualified scaffolders, installing cable glands, and using plugs. It also found blocked access areas, modified power tools, and poor housekeeping. The contractor must clear access areas, remove damaged tools, and improve housekeeping. Corrective actions were taken and documented with close out photos.

Uploaded by

faisal nadeem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views2 pages

HSE Observation Report: Safety Issues

The HSE observation report details 6 issues found at various locations on site. It notes that an unqualified carpenter was erecting scaffolding, electrical boxes were installed without cable glands, and power tools were being used without plugs. It recommends only allowing qualified scaffolders, installing cable glands, and using plugs. It also found blocked access areas, modified power tools, and poor housekeeping. The contractor must clear access areas, remove damaged tools, and improve housekeeping. Corrective actions were taken and documented with close out photos.

Uploaded by

faisal nadeem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

HSE Observation Report

Date: 6-4-2020
Action required /
S. No Location Issues Photograph Rectification Close Out Photo
Recommendations

Contractor needs to ensure


that only trained and Penalty issued to the
Found carpenter violator .and informed to
competent scaffolders the scaffold inspector do
1 Water Tank was installing allowed to erect or not allow to incompetent
scaffold structure dismantle the any person for erecting and
scaffolding structures dismantling of scaffold ..

Contractor must ensure


Observed that the
that all electrical DB’s are
Level-2, A05 electrical DB Insulation provided
2 installed properly with
installed without around the cables .
using cable glands. I cable glands in place

Observed that Contractor need to ensure


Damage power cable
operative is using that plugs should be and tools has been
3 Level-1 A05 power tool without maintained for power tools removed and new cable
plug, inserting cable installed by competent
cables person .
directly in the power
socket
HSE Observation Report

Action required /
S. No Location Issues Photograph Rectification Close Out Photo
Recommendations

Contractor needs to
Found and Observed Water tank access has
ensure that all access and
steel rebar were been clear .material
4 Water Tank egress paths are clear and shifted in designated
found and blocking
free from obstruction storage area .
the access

Contractor needs to ensure


Found and Observed that All damaged power Damage power tools
5 modified tools were tools must be removed and has been removed
Level-1 A05
using on site not to use on site from the site .

Contractor need to
Observed Poor
maintained a good
Housekeeping at all
housekeeping all over the Proper housekeeping
6 A02, A05 over the building
building premises is done .
premises
(A02&A05)