The HSE observation report details 10 issues found at a construction site along with required actions and recommendations. Issue 1 involved an operative standing on a ladder without support. Issue 2 involved an operative working at height without a safe platform. Issue 3 involved using duct tape instead of clamps to tie a ladder to scaffolding. The remaining issues involved damaged equipment, lack of inspections, improper PPE, poor illumination and housekeeping. For each issue, contractor action was required like training, equipment replacement, inspections to rectify safety risks and prevent reoccurrence.

Uploaded by

irfan shafique
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
884 views6 pages

ZFP Sor 2022-12-7

The HSE observation report details 10 issues found at a construction site along with required actions and recommendations. Issue 1 involved an operative standing on a ladder without support. Issue 2 involved an operative working at height without a safe platform. Issue 3 involved using duct tape instead of clamps to tie a ladder to scaffolding. The remaining issues involved damaged equipment, lack of inspections, improper PPE, poor illumination and housekeeping. For each issue, contractor action was required like training, equipment replacement, inspections to rectify safety risks and prevent reoccurrence.

Uploaded by

irfan shafique
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 6

HSE Observation Report

Date: 7-12-2022
Potential
Location Action required /
S.no Issues Photograph Risk Rectification Close Out Photo
Recommendations
Level

Found operative was Life


Contractor need to Critical
standing on the A-
Basement- frame ladder without conduct awareness One
1
2 training to the workers working
support (repeated by day
regarding Ladder Safety
Meras operatives)

Contractor need to
Operative was found provide a safe & proper Life
working unsafe working platform and Critical
2 Basement- while performing the conduct awareness
One
1 working
job, potential risk of training to the workforce day
fall from height regarding safe working
platform
HSE Observation Report

Potential
Location Action required /
S.no Issues Photograph Risk Rectification Close Out Photo
Recommendations
Level

Observed that duct


Contractor need to use Non-Life
tape was used to tie
Proper fittings (Clamps) Critical
the ladder of
instead of ropes/ tape , 1>3
3 Basement- Scaffold, Green tag must be checked and working
2 in place, evidence day
supervise by competed
that no inspection
scaffold inspector
conducted

Contractor ensure that Non-Life


Observed that all operatives using Critical
4 Basement- damaged disc was power tools are trained 1>3
2 using for cutting by & competent, damaged working
Meras operative disc must remove and day
strictly not to use on site
HSE Observation Report

Potential
Location Action required /
S.no Issues Photograph Risk Rectification Close Out Photo
Recommendations
Level

Contractor need to
ensure that all power Non-Life
Damaged cable tools must be inspected Critical
Basement- cables using on the 1>3
5 prior to use. All working
2 site for power tools damaged electrical cable day
must be repaired and
fixed properly

Non-Life
Contractor need to Critical
Skid loader was
Basement- found on site with ensure that all plant & 1>3
6 working
1 equipment must have
defective head light day
operational head light
HSE Observation Report

Potential
Location Action required /
S.no Issues Photograph Risk Rectification Close Out Photo
Recommendations
Level

Operatives were Non-Life


Contractor must instruct
found using Critical
their operatives do not
Ground pedestrian stair 1>3
7 use pedestrian access for
Floor access for working
material shifting, and day
transferring the
provide signage’s
material

Contractor need to Non-Life


Operative was found ensure that all operatives Critical
8 Basement- using damaged PPE working at site must 1>3
2 ( gloves) while provide proper / good working
performing the job conditioned PPE , day
replace the damaged
HSE Observation Report

Potential
Location Action required /
S.no Issues Photograph Risk Rectification Close Out Photo
Recommendations
Level

Contractor need to
replace the damaged Non-Life
Poor illumination Critical
bulb, ensure that toilets
Ground was observed at 1>3
9 are well illuminated,
Floor office toilets due working
Inspection must be day
failure of bulb
conducted in regular
basis.

Contractor need to
advise their sub
Poor housekeeping contractor remove the Non-Life
was observed at waste from site on Critical
1>3
10 Basement- several places, regular basis, and working
1 evidence of Poor maintain a good day
Housekeeping housekeeping at all
over the building
premises

Prepared by:
Mohammed Vajid Ali
HSE Observation Report

Life Critical Major failure e.g. fatality, LTI, major injury, or Immediate> 1 Working day (if not temporary suspended)
dangerous occurrence
Non-Life Critical Potential Minor injury Incident, Environmental or 1 > 3 working day
Welfare Issue.
Good Practice N/A None however look to share good practice