Safety Risk Assessment Guide

The document identifies hazards and assesses risks associated with a project. It lists hazards such as exposure to road traffic, improper tool use, falling objects, and machine malfunctions. For each hazard, it rates inherent risk and outlines current control measures. Residual risks are also rated after considering controls. It recommends future control measures to reduce risks.

Uploaded by

Shubham Shukla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
262 views3 pages

Safety Risk Assessment Guide

The document identifies hazards and assesses risks associated with a project. It lists hazards such as exposure to road traffic, improper tool use, falling objects, and machine malfunctions. For each hazard, it rates inherent risk and outlines current control measures. Residual risks are also rated after considering controls. It recommends future control measures to reduce risks.

Uploaded by

Shubham Shukla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

HAZARD INDENTIFICACTION AND RISK ASSESSMENT TGPL-AD-HSE01 TEM001

Name of Project:- Date-

Location-

Type of Activity/Condition:

*Assessment
Residual risk (after control
Inherent risk (with no controls)
Type of Hazards Consequence / assessment )

Impact Risk
R R Future control
I P Current control measures(P) Current control measures( I) I P Categor
(IxP) (IxP) measures
y

• Exposure to • Carry out the Hazard Identification and risk assessment • Ensure wearing of appropriate
Road Traffic and implement identified control measures PPE as per risk exposure
• Improper use • Carry out tool box talk • Ensure availability of first aid box
of tools, tackels Fatality 4 3 12 • Comply with the permit to work system as applicable and person trained in first aid 4 2 8 Medium
& equipment • Ensure the job is performed by trained and competent treatment.
• Struck with person • Ensure identification of nearby
moving • Ensure supervison of safety critical job by safety emergency medical aid facilities
equipment competent supervisor • Ensure that contigency plan is in
• Exposure • Ensure material, tool and equipment required for place
of/damage to performing the job are fit for purpose. • Ensure availability of required fire
underground • Ensure proper barricading and display of safety/warning extinguisher and person trained in
body injury 4 3 12 3 2 6 Medium
power line, fuel signages fire fighting
line, other • Restrict unauthorized entry in work area/trench. • Seek help of fire department as
utilities. • Follow good housekeeping practices required
• Falling/slipping • Proper back filling i.e watering, compaction and site • Seek help of ambulance services
of object or pipe restoration done as per procedure as required
on body • Provide Steps, Ladder or Ramp for Safe exit from • Earthing/grounding of the
• Malfunctioning Excavated trench. equipment/machine
of machine Asset/Property damage 4 4 16 • Keep excavated soil at safe distance from the trench edge • Power cable strike alert system is 3 2 6 Medium

mechanisms/ • Water removed to control the level of accumulating water available.


break down • Ensure provision of entry and exit from the trench. • Collect Bentonite waste from Site
• Diesel Filling & • Proper boring/pulling plan decided based on pipe size and and disposed it off at identified
•Handling
Exposurein to
HDD Fatality 5 4 20 • Ensure
HDD appropriate break/time off
hole size. between the working •land
Provision
fill site of drinking water at 5 3 15 High
Dust
machine hours. site.
• Exposure to • Use of special respiratory mask
sun heat at suspected areas where potential
• Exposure to of soil contamination
chemical • Ensure wearing of appropriate
contaminated PPE as per risk exposure
soil/liquid/toxic
gases
Dust hours. site.
• Exposure to • Use of special respiratory mask
sun heat at suspected areas where potential
• Exposure to of soil contamination
chemical • Ensure wearing of appropriate
occupational illness (Heat Stress,
contaminated PPE as per risk exposure
Sunburn, Dehydration, lung dieses, skin 4 3 12 4 2 8 Medium
soil/liquid/toxic
dieses etc… ) Hierachy of controls:
gases
1. Elimination - remove
• Exposure to
the hazard;
vibration/high
2. Substitution - replace
noise of breaking
a process or a
equipment.
Identify and implement Controls & Recovery measures to reduce the Risk to ALARP and provide documented substance with a less
15-25
HIRA Prepared Contractor Supervisor: (Name and Sign) demonstration of ALARP by Bow-Tie or equivalent methodology hazardous one;
By Identify and implement Controls and Recovery measures to reduce the Risk to As Low As Reasonably Practicable 3.Engineering -
08 - 12
TPE: (Name and Sign) (ALARP). provide documented demonstration of ALARP by Bow-Tie or equivalent methodology redesigning equipment
04 - 06 Manage for continuous improvement through the effective implementation of HSE management System or a process;
HIRA Reviewed By
TGPL In-charge/AIC/DIC: (Name and Sign) 01 - 03 Manage for continuous improvement, although business may set lower priority for further Risk reduction 4. Administration -
Review during Shift change: training, instructions,
DD/MM/YYYY and 00:00 Hrs Contractor: (Name and Sign) TPIA/PMC: (Name and Sign) safe working
TGPL: (Namepractices;
and Sign)
Review during Shift change: 5. Personal Protective
DD/MM/YYYY and 00:00 Hrs Contractor: (Name and Sign) TPIA/PMC: (Name and Sign) Equipment
TGPL: -Helmet,
(Name and Sign)
Review during Shift change: Safety Shoes, etc.
DD/MM/YYYY and 00:00 Hrs Contractor: (Name and Sign) TPIA/PMC: (Name and Sign) TGPL: (Name and Sign)
Review during Shift change:
DD/MM/YYYY and 00:00 Hrs Contractor: (Name and Sign) TPIA/PMC: (Name and Sign) TGPL: (Name and Sign)
Review during Shift change:
DD/MM/YYYY and 00:00 Hrs Contractor: (Name and Sign) TPIA/PMC: (Name and Sign) TGPL: (Name and Sign)
Review during Shift change:
TGPL: (Name and Sign)
DD/MM/YYYY and 00:00 Hrs Contractor: (Name and Sign) TPIA/PMC: (Name and Sign)