REEM HILLS-REEM MAINLAND TOWNHOUSE&SEMI-DETACHED VILLAS(412) -
:
Project PHASE 1B & 1C
Employer : Reem Hills Sole Properietorship LLC
Royal Development Company and
Employer Project Manager :
Rapm Architect Project Management
Consultant : Aecom Middle East – Abu Dhabi
Main Contractor : Trojan General Contracting LLC
MEP Contractor : Royal Advance Electro Mechanical Works LLC
CHECKLIST FOR THE INSTALLATION OF UNDERGROUND UPVC DUCT PIPE & ACCESSORIES
WIR NO.: Location: Date:
Checked by Checked by
SN Items to be checked Contractor Consultant Remarks
N/A
N/A
Yes
Yes
No
No
HSE Requirements
1 All the HSE requirements are fulfilled.
QA/QC Requirements
1 Check the site is well coordinated
Check all ducts are verified and approved through MIR.
Method Statement for this activity is approved
Check the material used is as per specifications/approved material
2
submittal
3 Check the sizes of the duct pipes as per drawing
4 Location are checked as per approved drawings.
5 Check the Duct pipes are supported and fixed properly
Check Duct pipe ends are closed and all the pipes and sleeves are
6
properly protected to avoid damages and blockages.
7 Check all the damaged Duct pipes and sleeves are replaced
8 Check the work has been done as per the shop drawings.
9 Check all ducts having pulling ropes.
For Final Approval
MEP Contractor Engineer MEP QA/QC Engineer Consultant Representative
Eng. Muhammad Saad Ur
Name: Eng. Vivek Name: Name:
Rehman
Signature: Signature: Signature:
Date: 28/05/2024 Date: 28/05/2024 Date:
TGC/QAQC/CHK/MEP/ELECT-01 REV-00 Page 1 of 1