Form :       : Checklist No.
1
                                                                                   Issue        : 012
                            CHECK LIST – NUMBER 1 - BRIDGE                         Date         : 27.08.2024
                                                                                   Approved     : RP
                             PRE – DEPARTURE CHECKLIST
MV                                                     Port
                                       Section 1 – Information & Routines
No                                                    Item                                                 Tick
 1   Draft/UKC & Trim in Compliance with Port Restrictions & Company Requirements
 2   Passage Plan Ready, Checked & Approved by Master with the route plotted on up-to-date and
     appropriate scale charts (official paper or electronic). Tides updated. ECDIS/User Maps/Charts
     Updated and Route from Berth to Berth Available. Route displayed on ECDIS and/or other
     electronic navigation aids, as appropriate.
3    Up-to-date charts and nautical publications available. Latest NMs (week number) ____________
4    ECDIS alarm and safety settings are as per MSO and Passage Plan. All ECDIS inputs from
     GPS, Echo sounder, Log and Gyro to be checked and aligned (as applicable)
5    Latest Navigational/Weather information available from all sources (Navtex/EGC/VHF).
     Maritime safety information (MSI) checked and communicated to bridge team.
6    All Relevant Bridge members briefed on Departure Plan and Passage plan. (B/CL 14 completed)
7    Anchors Cleared Away
8    All HOD’s confirm all crew onboard. Bridge and engine room teams watch conditions
     implemented as per SI 17.34 and SI 6.26.
9    Crew and ER have been advised of the time for standby/unmooring. Mooring stations manned
     and ready.
10   Security Search Carried out (Stowaway / Drugs etc.)
11   Reports sent to VTS/Port Authorities as required by local regulations or any special requirements
12   For PCTC vessels – Fire alarm panel checked – All Alarms switched ON
13   Pressure on Fire Main (Fire pump / line tested and ready for use)
                                   Section 2 – Equipment (Tested & Ready to Use)
No                    Item                    Tick   No                                                     Tick
 1   Clocks Synchronised with engine                  2    Mooring Winches Tested and Ready
     room
3    Course & ME recorder & Bell Book                 4    AIS Updated with voyage information and
                                                           correct
5    Flags/Nav Lights/Shapes/Sound                    6    Deck Power/Lighting available (as applicable)
     signaling equip including flags,
     search lights and signal lamps
7    Ships VHF/UHF’s, Internal comms                  8    Gyro/magnetic compass & repeaters incl
     (Incl ECR/ Mooring stations).                         repeater in steering gear room
9    Nav Equipment (ROT/RPM/Rudder                   10 2 Steering Pumps Running (if applicable) &
     indicators, Radars, ARPA, ECDIS,                      Steering Gear Tested a/p CL#8
     Echosounder-accuracy checked,
     GPS, VDR, LRIT etc). Heading
     accuracy output to all navigational
     equipment checked.
11   VHF’s tested and listening watch                12 After Confirming “All Clear” has the Main
     maintained on the correct channels                    Engine been tested Ahead & Astern
13   Notice has been given for the                   14 GMDSS Equip, including log entry.
     bowthruster (if applicable)
15   Ancillary bridge equipment (e.g.                16 BNWAS switched ‘ON’ by Master (Manual
     binoculars, window wipers)                            ON mode)
17   Date of last test of Emergency                  18 Speed and distance log
     engine stops? ……………………
     (To be tested 6-monthly)
     File: TO 04                                                                     Retention period: 1 Year
                                            Section 2 – Securing for Sea
No   Item                                                                                                   Tick
 1   Cargo & Cargo Gear Secured for Sea. (ref C/O Pre-Sailing Aide Memoire)
 2   Stability and draft info ready & in compliance & Cargo details available (Incl IMDG info as
     applicable)
3    Hull openings/Watertight Doors closed and secured
                                           Section 3 – Pilotage Info
No                                                  Item                                                    Tick
 1   Port / VTS channels monitored,and Pilot Boarding time/side/arrangements agreed?
 2   Pilot Card and Master/pilot information exchange checklist completed and ready for use
 3   Pilot Disembarking arrangements agreed, checked and found ready for use
 4   Port, VTS and pilot informed of any special requirements
                                        Section 4 – Checklist Completion
No   Item                                                                                                   Tick
 1   Master informed that the Checklist has been completed (GO / NO GO)
Completed – OOW - …………………………………. Time……………. Date…………….
Note: Logbook entry to be made when Master switches on BNWAS. Ref SI.6.150
     File: TO 04                                                                      Retention period: 1 Year