Noapara, Jessore
Operation Engineer Name
Javed Md.Fazlul Haque
Daily Engine Observation Report & Work O Engine No. 8
Running Load 5.8
Shift In-Charge Name
S/N
Mechanical Problems: 01 L/O circulation low at B6 left side exhaustvalve 02 water leakage from A bank intake air manifold near at cylinder A9. 03 Intake air manifold temp difference high A=27,B=37. 04 05 06 07 08 09 10 11
S/N
Exh. Temp. A 451 452 421 437 461 432 435 441 432 481
Electrical Problems:
01 02 03
L/O Press. (bar) L/O Temp. (I/O) Bearing Temp.( C)
o
6.5 51/58
J/W Press. (bar) J/W Temp. (I/O)
2.9 48/57
R/W Press. (bar) R/W Temp. (I/O)
3.1 23/25
67
70
69
69
70
71
70
Spare Parts Used
Report By Operation Maint. Work Start Time:
Engine Taken By Maintenance
apara, Jessore 0:00 4283 Peak Pressure
Last Start Time/Date
on Report & Work Order Form Reporting Time 8
5.8
Cumm. Running HRS
15:52/01.02.13 01.02.2013
Date
Exh. Temp. B 421 422 441 421 432 392 421 425 402 462
Fuel rack Posn. A B 31 30 28 28 29 27 27 27 29 33 30 32 30 30 34 30 31 30
Action Taken by Maint. Dept.
Fuel Press. (bar) Fuel Temp. (oC)
5.5 105
Intake Air Temp. A/B Intake Air Press. A/B
28/36 1.5/1.0
R.ARM L/O Press. 1.25 (bar) T/C RPM (A/B) 12000/13500
70
69
66
61
51
Engine Handover/ Work Done Reported Maintenance Work Done Time:
Engine Clearance Taken By Operation
Noapara, Jessore
Operation Engineer Name
Javed Md.Fazlul Haque
Daily Engine Observation Report & Work O Engine No. 6
Running Load 6
Shift In-Charge Name
S/N
01 02 03 04 05 06 07 08 09 10 11
S/N
Mechanical Problems: All HPFP side cover has opened need to again filling. HFO leakage from common return line joint near R/A tank. Exhaust gas leakage from head to liner at B3 Small belows red in B3 cylinder. (Temp=495C). Intake air temp difference A=43,B=35.
Exh. Temp. A 360 405 390 391 415 428 431 392 383 465
Electrical Problems:
01 02 03
L/O Press. (bar) L/O Temp. (I/O) Bearing Temp.(oC)
6 54/59
J/W Press. (bar) J/W Temp. (I/O)
3 51/61
R/W Press. (bar) R/W Temp. (I/O)
3 26/27
73
72
73
73
74
73
74
Spare Parts Used
Report By Operation Maint. Work Start Time:
Engine Taken By Maintenance
Noapara, Jessore 0:00 3819.54 Peak Pressure
Last Start Time/Date
servation Report & Work Order Form Reporting Time 6
6
Cumm. Running HRS
12:25/01.02.13 01.02.2013
Date
Exh. Temp. B 380 385 495 378 450 425 406 393 378 456
Fuel rack Posn. A B 30 22 31 23 32 21 32 22 31 24 32 24 30 18 28 22 29 22
Action Taken by Maint. Dept.
Fuel Press. (bar) Fuel Temp. ( C)
o
5.9 113
Intake Air Temp. A/B Intake Air Press. A/B
41/34
R.ARM L/O Press. (bar) T/C RPM (A/B)
1.2 11200/11000
74
72
70
58
66
Engine Handover/ Work Done Reported Maintenance Work Done Time:
Engine Clearance Taken By Operation
Noapara, Jessore
Operation Engineer Name
Rajib Md.Fazlul Haque
Daily Engine Observation Report & Work O Engine No. 2
Running Load 6
Shift In-Charge Name
S/N
Mechanical Problems: 01 R/A L/O leakage from push guide line in cylinder A1,2,3,5,7,8,9 B2,4,5,6,7,8,9 02 R/A pressure gauge not work. 03 Exhaust gas leakage from small bellows in cylinder B4,5,6,9 04 HPFP side cover is B7,9 has dissamble need to filling. 05 06 07 08 09 10 11
S/N
Exh. Temp. A 399 353 407 420 368 433 421 411 370 470
Electrical Problems:
01 02 03
L/O Press. (bar) L/O Temp. (I/O) Bearing Temp.( C)
o
5.5 53/55
J/W Press. (bar) J/W Temp. (I/O)
3.2 73/81
R/W Press. (bar) R/W Temp. (I/O)
2.6 28/30
61
65
70
71
71
71
72
Spare Parts Used
Report By Operation Maint. Work Start Time:
Engine Taken By Maintenance
apara, Jessore 0:00 3768.35 Peak Pressure
Last Start Time/Date
on Report & Work Order Form Reporting Time 2
6
Cumm. Running HRS
16:42/01.02.13 01.02.2013
Date
Exh. Temp. B 431 432 398 368 402 397 413 391 402 501
Fuel rack Posn. A B 32 30 26 30 29 32 33 29 29 30 31 33 30 29 32 30 29 32
Action Taken by Maint. Dept.
Fuel Press. (bar) Fuel Temp. (oC)
5.8 115
Intake Air Temp. A/B Intake Air Press. A/B
39/37 1.4/1.1
R.ARM L/O Press. (bar) T/C RPM (A/B) 13200/12000
72
71
71
61
50
Engine Handover/ Work Done Reported Maintenance Work Done Time:
Engine Clearance Taken By Operation
Noapara, Jessore
Operation Engineer Name
Rajib Md.Fazlul Haque
Daily Engine Observation Report & Work O Engine No. 1
Running Load 6
Shift In-Charge Name
S/N
Mechanical Problems:
01 R/A L/O pressure low 0.50 2 Both T/C vibration and abnormal sound. 03 Both exhaust manifold red hot. 04 L/O leakage from the push guid A=2.5, B=1.3,4.8 05 A4 cylinder small bellows clamp open and sparking. 06 07 08 09 10 11
S/N
Exh. Temp. A 413 425 423 402 436 437 445 410 411 495
Electrical Problems:
01 02 03
L/O Press. (bar) L/O Temp. (I/O) Bearing Temp.( C) <A
o
5.7 52/61
J/W Press. (bar) J/W Temp. (I/O)
3.2 75/80
R/W Press. (bar) R/W Temp. (I/O)
3.4 26/29
60
68
72
69
72
72
75
Spare Parts Used
Report By Operation Maint. Work Start Time:
Engine Taken By Maintenance
apara, Jessore 0:00 2894.99 Peak Pressure
Last Start Time/Date
on Report & Work Order Form Reporting Time 1
6
Cumm. Running HRS
15:40/01.02.13 01.02.2013
Date
Exh. Temp. B 428 395 398 402 431 422 424 440 360 420
Fuel rack Posn. A B 30 30 30 30 30 30 30 30 30 29.5 29.5 29.5 30 29.5 29.5 30 29 28
Action Taken by Maint. Dept.
Fuel Press. (bar) Fuel Temp. (oC)
5.9 111
Intake Air Temp. A/B Intake Air Press. A/B
36/31 1.2/0.9
R.ARM L/O Press. 1.9 (bar) T/C RPM (A/B) 12000/12500
71
71
71
45
54
Engine Handover/ Work Done Reported Maintenance Work Done Time:
Engine Clearance Taken By Operation