PROJECT:
2 X 150 MW COAL BASED TPP, BHADRESHWAR, GUJARAT
DOCUMENT TITLE:
BREAKER LOGIC / PROTECTION CHECK LIST
(UNIT - 2)
Client
Project Consultant
OPGS POWER GUJARAT PVT LTD.
Aquatherm Engineering Consultants (India) Pvt.
Limited
9336
No
Project No.
Document / Drawing No.
4-9336-300-003
PROJECT CONSULTANT:
Aquatherm Engineering Consultants (India) Pvt. Limited,
2
nd
Floor, St. Thomas Building,
# 68 (Old No. 150), Luz Church Road,
Mylapore,
Chennai  600 004, India.
Tel : +91-44-24994032 / 24660462 / 24660464 / 24982201
Fax : +91-44-24996085.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
6.6KV UAS-2A BREAKER
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
6.6KV UAS -2A Trip Operated
Open
Open comments from screen
CLOSE PERMISSIVES
415V UAS-2A Breaker opened
6.6KV UAS -2A Trip not operated
Close
Close comments from screen
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
6.6KV UAS-2B BREAKER
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
6.6KV UAS -2B Trip Operated
Open
Open comments from screen
CLOSE PERMISSIVES
415V UAS-2B Breaker opened
6.6KV UAS -2B Trip not operated
Close
Close comments from screen
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
415V UAS-2A BREAKER (PMCC)
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
415V UAS-2A Breaker Trip Operated
6.6KV UAS-2A Breaker opened
Open
Open comments from screen
B
CLOSE PERMISSIVES
Bus Coupler opened Condition
415V UAS Bus Coupler opened
6.6KV UAS-2A Breaker closed
Close
415V UAS-2A Breaker not tripped
2
Bus Coupler Closed Condition
415V UAS Bus Coupler closed
6.6KV UAS-2A Breaker closed
415V UAS-2A Breaker not tripped
Close
415V UAS-2B Breaker opened
415V UAS-2B Breaker not tripped
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
415V UAS-2B BREAKER (PMCC)
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
415V UAS-2B Breaker Trip Operated
6.6KV UAS-2B Breaker opened
Open
Open comments from screen
B
CLOSE PERMISSIVES
Bus Coupler opened Condition
415V UAS Bus Coupler opened
6.6KV UAS-2B Breaker closed
Close
415V UAS-2B Breaker not tripped
2
Bus Coupler Closed Condition
415V UAS Bus Coupler closed
6.6KV UAS-2B Breaker closed
415V UAS-2B Breaker not tripped
Close
415V UAS-2A Breaker opened
415V UAS-2A Breaker not tripped
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
415V UAS-BC BREAKER (PMCC)
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
415V UAS Bus Coupler Trip Operated
Open
Open comments from screen
CLOSE PERMISSIVES
Remote:
415V UAS-2A Breaker opened
415V UAS-2A Breaker not tripped
Close
415V UAS-2B Breaker Closed
415V UAS B/C trip not operated
OR
415V UAS-2B Breaker opened
415V UAS-2B Breaker not tripped
Close
415V UAS-2A Breaker Closed
415V UAS B/C trip not operated
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
6.6KV ESP-2A BREAKER
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
6.6KV ESP -2A Trip Operated
Open
Open comments from screen
CLOSE PERMISSIVES
415V ESP-2A Breaker opened
6.6KV ESP -2A Trip not operated
Close
Close comments from screen
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
6.6KV ESP-1B BREAKER
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
6.6KV ESP -2B Trip Operated
Open
Open comments from screen
CLOSE PERMISSIVES
415V ESP-2B Breaker opened
6.6KV ESP -2B Trip not operated
Close
Close comments from screen
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
415V ESP-2A BREAKER (MCC)
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
415V ESP-2A Breaker Trip Operated
6.6KV ESP-2A Breaker opened
Open
Open comments from screen
B
CLOSE PERMISSIVES
Bus Coupler opened Condition
415V ESP Bus Coupler opened
6.6KV ESP-2A Breaker closed
Close
415V ESP-2A Breaker not tripped
2
Bus Coupler Closed Condition
415V ESP Bus Coupler closed
6.6KV ESP-2A Breaker closed
415V ESP-2A Breaker not tripped
Close
415V ESP-2B Breaker opened
415V ESP-2B Breaker not tripped
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
415V ESP-2B BREAKER (MCC)
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
415V ESP-2B Breaker Trip Operated
6.6KV ESP-2B Breaker opened
Open
Open comments from screen
B
CLOSE PERMISSIVES
Bus Coupler opened Condition
415V ESP Bus Coupler opened
6.6KV ESP-2B Breaker closed
Close
415V ESP-2B Breaker not tripped
2
Bus Coupler Closed Condition
415V ESP Bus Coupler closed
6.6KV ESP-2B Breaker closed
415V ESP-2B Breaker not tripped
Close
415V ESP-2A Breaker opened
415V ESP-2A Breaker not tripped
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
415V ESP-BC BREAKER (MCC)
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
415V ESP Bus Coupler Trip Operated
Open
Open comments from screen
CLOSE PERMISSIVES
Remote:
415V ESP-2A Breaker opened
415V ESP-2A Breaker not tripped
415V ESP-2B Breaker Closed
Close
415V ESP B/C in remote mode
Confirm through telephonic
415V ESP B/C trip not operated
OR
415V ESP-2B Breaker opened
415V ESP-2B Breaker not tripped
415V ESP-2A Breaker Closed
Close
415V ESP B/C in remote mode
Confirm through telephonic
415V ESP B/C trip not operated
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
BOILER UAS-2A BREAKER (PMCC)
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
Boiler UAS (PMCC) -2A Trip Operated
Open
Open comments from screen
CLOSE PERMISSIVES
Boiler MCC -2A Breaker opened
Boiler UAS (PMCC) -2A Trip not operated
Close
Close comments from screen
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
BOILER UAS-2B BREAKER (PMCC)
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
Boiler UAS (PMCC) -2B Trip Operated
Open
Open comments from screen
CLOSE PERMISSIVES
Boiler MCC -2B Breaker opened
Boiler UAS (PMCC) -2B Trip not operated
Close
Close comments from screen
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
BOILER MCC-2A BREAKER
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
Boiler MCC -2A Breaker Trip Operated
Boiler UAS (PMCC) - 2A Breaker opened
Open
Open comments from screen
B
CLOSE PERMISSIVES
Bus Coupler opened Condition
Boiler MCC Bus Coupler opened
Boiler UAS (PMCC) -2A Breaker closed
Close
Boiler MCC -2A Breaker not tripped
2
Bus Coupler Closed Condition
Boiler MCC Bus Coupler closed
Boiler UAS (PMCC) -2A Breaker closed
Boiler MCC -2A Breaker not tripped
Close
Boiler MCC -2B Breaker opened
Boiler MCC -2B Breaker not tripped
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode, confirm
throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
BOILER MCC-2B BREAKER
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
Boiler MCC -2B Breaker Trip Operated
Boiler UAS (PMCC) - 2B Breaker opened
Open
Open comments from screen
B
CLOSE PERMISSIVES
Bus Coupler opened Condition
Boiler MCC Bus Coupler opened
Boiler UAS (PMCC) -2B Breaker closed
Close
Boiler MCC -2B Breaker not tripped
2
Bus Coupler Closed Condition
Boiler MCC Bus Coupler closed
Boiler UAS (PMCC) -2B Breaker closed
Boiler MCC -2B Breaker not tripped
Close
Boiler MCC -2A Breaker opened
Boiler MCC -2A Breaker not tripped
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
BOILER MCC - BC BREAKER
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
Boiler MCC Bus Coupler Trip Operated
Open
Open comments from screen
CLOSE PERMISSIVES
Remote:
Boiler MCC -2A Breaker opened
Boiler MCC -2A Breaker not tripped
Boiler MCC-2B Breaker Closed
Close
Boiler MCC B/C in remote mode
Confirm through telephonic
Boiler MCC B/C trip not operated
OR
Boiler MCC -2B Breaker opened
Boiler MCC -2B Breaker not tripped
Boiler MCC-2A Breaker Closed
Close
Boiler MCC B/C in remote mode
Confirm through telephonic
Boiler MCC B/C trip not operated
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
TG UAS-2A BREAKER (PMCC)
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
TG UAS (PMCC) -2A Trip Operated
Open
Open comments from screen
CLOSE PERMISSIVES
TG MCC -2A Breaker opened
TG UAS (PMCC) -2A Trip not operated
Close
Close comments from screen
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
TG UAS-2B BREAKER (PMCC)
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
TG UAS (PMCC) -2B Trip Operated
Open
Open comments from screen
CLOSE PERMISSIVES
TG MCC -2B Breaker opened
TG UAS (PMCC) -2B Trip not operated
Close
Close comments from screen
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
TG MCC-2A BREAKER
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
TG MCC -2A Breaker Trip Operated
TG UAS (PMCC) - 2A Breaker opened
Open
Open comments from screen
B
CLOSE PERMISSIVES
Bus Coupler opened Condition
TG MCC Bus Coupler opened
TG UAS (PMCC) -2A Breaker closed
Close
TG MCC -2A Breaker not tripped
2
Bus Coupler Closed Condition
TG MCC Bus Coupler closed
TG UAS (PMCC) -2A Breaker closed
TG MCC -2A Breaker not tripped
Close
TG MCC -2B Breaker opened
TG MCC -2B Breaker not tripped
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
TG MCC-2B BREAKER
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
TG MCC -2B Breaker Trip Operated
TG UAS (PMCC) - 2B Breaker opened
Open
Open comments from screen
B
CLOSE PERMISSIVES
Bus Coupler opened Condition
TG MCC Bus Coupler opened
TG UAS (PMCC) -2B Breaker closed
Close
TG MCC -2B Breaker not tripped
2
Bus Coupler Closed Condition
TG MCC Bus Coupler closed
TG UAS (PMCC) -2B Breaker closed
TG MCC -2B Breaker not tripped
Close
TG MCC -2A Breaker opened
TG MCC -2A Breaker not tripped
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
TG MCC - BC BREAKER
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
TG MCC Bus Coupler Trip Operated
Open
Open comments from screen
CLOSE PERMISSIVES
Remote:
TG MCC -2A Breaker opened
TG MCC -2A Breaker not tripped
TG MCC-2B Breaker Closed
Close
TG MCC B/C in remote mode
Confirm through telephonic
TG MCC B/C trip not operated
OR
TG MCC -2B Breaker opened
TG MCC -2B Breaker not tripped
TG MCC-2A Breaker Closed
Close
TG MCC B/C in remote mode
Confirm through telephonic
TG MCC B/C trip not operated
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
6.6KV ACC - 2A BREAKER
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
6.6KV ACC -2A Trip Operated
Open
Open comments from screen
CLOSE PERMISSIVES
415V ACC-2A Breaker opened
6.6KV ACC -2A Trip not operated
Close
Close comments from screen
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
6.6KV ACC - 2B BREAKER
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
6.6KV ACC -2B Trip Operated
Open
Open comments from screen
CLOSE PERMISSIVES
415V ACC-2B Breaker opened
6.6KV ACC -2B Trip not operated
Close
Close comments from screen
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
6.6KV ACC - 2C BREAKER
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
6.6KV ACC -2C Trip Operated
Open
Open comments from screen
CLOSE PERMISSIVES
415V ACC-2C Breaker opened
6.6KV ACC -2C Trip not operated
Close
Close comments from screen
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
415V ACC -2A BREAKER (MCC)
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
415V ACC-2A Breaker Trip Operated
6.6KV ACC-2A Breaker opened
Open
Open comments from screen
B
CLOSE PERMISSIVES
Bus Coupler opened Condition
415V ACC Bus Coupler-1 opened
6.6KV ACC-2A Breaker closed
Close
415V ACC-2A Breaker not tripped
Bus Coupler Closed Condition
415V ACC Bus Coupler-1 closed
6.6KV ACC-2A Breaker closed
415V ACC-2A Breaker not tripped
415V ACC-2B Breaker opened
Close
415V ACC-2B Breaker not tripped
415V ACC Bus coupler -2 Breaker opened
415V ACC Bus coupler -2 Breaker not tripped
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
415V ACC -2C BREAKER (MCC)
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
415V ACC-2C Breaker Trip Operated
6.6KV ACC-2C Breaker opened
Open
Open comments from screen
B
CLOSE PERMISSIVES
Bus Coupler opened Condition
415V ACC Bus Coupler-2 opened
6.6KV ACC-2C Breaker closed
Close
415V ACC-2C Breaker not tripped
Bus Coupler Closed Condition
415V ACC Bus Coupler-2 closed
6.6KV ACC-2C Breaker closed
415V ACC-2C Breaker not tripped
415V ACC-2B Breaker opened
Close
415V ACC-2B Breaker not tripped
415V ACC Bus coupler -1 Breaker opened
415V ACC Bus coupler -1 Breaker not tripped
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT: BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
DATE
4-9336-300-003
Sr. No
DESCRIPTION
Equipment
415V ACC -2B BREAKER (MCC)
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
415V ACC-2B Breaker Trip Operated
6.6KV ACC-2B Breaker opened
Open
Open comments from screen
B
CLOSE PERMISSIVES
Bus Coupler-1 opened Condition
415V ACC Bus Coupler-1 opened
6.6KV ACC-2B Breaker closed
415V ACC-2B Breaker not tripped
Close
415V ACC Bus Coupler-2 opened (OR) (ACC Bus Coupler-2
closed & ACC-2C breaker opened)
Bus Coupler-1 closed Condition
415V ACC Bus Coupler-1 closed
6.6KV ACC-2B Breaker closed
415V ACC-2B Breaker not tripped
Close
415V ACC Bus Coupler-2 opened
415V ACC-2A Breaker opened
Bus Coupler-2 opened Condition
415V ACC Bus Coupler-2 opened
6.6KV ACC-2B Breaker closed
415V ACC-2B Breaker not tripped
Close
415V ACC Bus Coupler-1 opened (OR) (ACC Bus Coupler-1
closed & ACC-2A breaker opened)
Bus Coupler-2 closed Condition
415V ACC Bus Coupler-2 closed
6.6KV ACC-2B Breaker closed
415V ACC-2B Breaker not tripped
Close
415V ACC Bus Coupler-1 opened
415V ACC-2C Breaker opened
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
415V ACC-BC 1 BREAKER (MCC)
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
415V ACC Bus Coupler-1 Trip Operated
Open
Open comments from screen
CLOSE PERMISSIVES
Remote:
415V ACC-2A Breaker opened
415V ACC-2A Breaker not tripped
415V ACC-2B Breaker Closed
Close
415V ACC B/C-1 trip not operated
415V ACC B/C-2 opened
Remote:
415V ACC-2B Breaker opened
415V ACC-2B Breaker not tripped
415V ACC-2A Breaker Closed
Close
415V ACC B/C-1 trip not operated
415V ACC B/C-2 opened
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
415V ACC-BC 2 BREAKER (MCC)
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
415V ACC Bus Coupler-2 Trip Operated
Open
Open comments from screen
CLOSE PERMISSIVES
Remote:
415V ACC-2C Breaker opened
415V ACC-2C Breaker not tripped
415V ACC-2B Breaker Closed
Close
415V ACC B/C-2 trip not operated
415V ACC B/C-1 opened
Remote:
415V ACC-2B Breaker opened
415V ACC-2B Breaker not tripped
415V ACC-2C Breaker Closed
Close
415V ACC B/C-2 trip not operated
415V ACC B/C-1 opened
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT: BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
DATE
4-9336-300-003
Sr. No
DESCRIPTION
Equipment
N/E UAS-2A BREAKER (PMCC)
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
PROTECTIONS
N/E UAS (PMCC) -2A Trip Operated
Open
Open comments from screen
CLOSE PERMISSIVES
N/E MCC -2A Breaker opened
N/E UAS (PMCC) -2A Trip not operated
Close
Close comments from screen
C
CHECKS
Selector Switch kept in local mode and feedback in DCS
Close/Open command from DCS
Local
Close/Open
Close/Open/Trip Indication in DCS
Available
Breaker in test position indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
Always remote mode. If local mode,
confirm throught telephone.
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
6.6KV UAS TIE BREAKER
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
CLOSE PERMISSIVES
POWER INITIAL RESTORE
Remote selected
UAS TIE not in trip condition
Independent selected in AIM switch
Close
UAS bus under voltage persisting
UAT incomer opened
SHUTDOWN PARALLEL
Manual selected in AIM switch
Remote selected
UAS TIE not in trip condition
PT selector switch in TIE
Close
Trip selector switch in incomer
UAS TIE open condition
UAT incomer closed
B
CHECKS
POWER INITIAL RESTORE:
Close command given with Bus energised condition
AIM Switch in independent
No Close
Independent selected
SHUTDOWN PARALLEL
Selector Switch kept in local mode and feedback in DCS
Selector Switch kept in remote mode and feedback in DCS
Local
Remote
Close command from DCS
Close
Open command from DCS
No open
Close/Open/Trip Indication in DCS
Available
Trip relay simulation on breaker Closed status
PT selector switch in TIE / Trip selector switch in incomer
After completion of shutdown parallel UAT incomer automatically open
Trip
Shutdown parallel
selected
Opened
REMARKS
1) Breaker cannot be open from DCS
2) After closing of TIE breaker UAT incomer automatically opened from hardware inter lock
Shall be consider with spare IO's
PROJECT:
2X150MW THERMAL POWER PLANT
CLIENT:
OPG GUJARAT
DOCUMENT:
ELECTRICAL BREAKER LOGIC / PROTECTION CHECK LIST
REV
DOC. NO:
4-9336-300-003
DATE
Sr. No
DESCRIPTION
Equipment
6.6KV UAT INCOMER BREAKER
1
21.04.14
REQUIREMENT
OBSERVATION / REMARKS
CLOSE PERMISSIVES:
STARTUP PARALLEL:
Manual selected in AIM selector switch
Remote selected
UAT incomer trip not operated
PT selector switch in incomer
Close
Trip selector switch in TIE
Synchronise permissive
UAS TIE close condition
B
CHECKS
Selector Switch kept in local mode and feedback in DCS
Selector Switch kept in remote mode and feedback in DCS
Local
Remote
Close command from DCS
Close
Open command from DCS
No open
Close/Open/Trip Indication in DCS
Available
Trip relay simulation on breaker Closed status
Trip
PT selector switch in incomer / Trip selector switch in TIE
Startup parallel
selected
After closing of UAT incomer
Auto required
After completion of startup parallel UAS TIE breaker automatically open
Shall be consider with spare IO's
Opened
REMARKS
1) Breaker cannot be open from DCS.
2) After closing of UAT incomer UAS TIE breaker automatically opened from hardware inter lock.
3) After completion of startup parallel AIM switch should be kept in Auto mode for auto changeover operation.