Appendix to CQAL MoM.
247089/IDEX/T-Div dt 03 May 2023
                        TESTS APPLICABLE AS PER L3 TABLE
   S.        Test        Test                         Test Conditions                        Expected
  No.                   number                                                                 Time
1.      Vibration         28      Clause 3.4.2 (c)                                          02 days
        (Refer Table              Endurance by sinusoid with frequency sweep Frequency
        4.28.2 Sl.1 &             range:5-8 Hz
        4) & 4.28.3)              Amplitude:±6mm constant displacement
                                  Frequency range:8-500 Hz
                                  ±15 m/s2 constant acceleration
                                  Duration:2hrs in each axis
                                  Sweep rate:1 Octave/min
                                  UUT in unpacked & switched OFF condition. Visual
                                  Examination & Performance Check to be carried out at the
                                  end of each axis.
2.      High            17        Clause 3.2.6.1(a) Procedure 6 and test condition ‘K’       03 days
        temperature               Operation at:+55 C±3 c
                                                     0     0
                                  Duration :24 hrs
                                  The UUT is in switched ON condition during the 24 Hrs test
                                  period. Performance Check to be carried out during final
                                  hour of the test.
                                  Visual examination and Performance check is carried out
                                  after the test with recovery period of 2-4 hours.
                                  Storage at: +700C±30C
                                  Duration :24 hrs
                                  The UUT is kept in switched OFF condition during the 24
                                  Hrs test period.
                                  Visual examination and Performance check is carried out
                                  after the test with recovery period of 2-4 hours.
3.      Damp heat            10   Clause 3                                                   02 days
                                  Temperature: +40 C ± 2 C
                                                       0     0
                                  Relative humidity: 93 ± 5% Duration:16 hrs
                                  The UUT is kept in switched OFF condition & UUT is
                                  switched On during the last one hour and Performance
                                  check is carried out.
                                  Visual examination and Performance check is carried out
                                  after the test with recovery period of 2-4 hours.
4.      Low             20        Test condition ‘K’, Procedure 4                            02 days
        temperature               Storage at:-30 C±3 c
                                                  0      0
                                  Duration :16 hrs
                                  The UUT is kept in switched OFF condition during the 16
                                  Hrs test period.
                                  Performance Check to be carried out during final hour of
                                  the test.
                                  Visual examination and Performance check is carried out
                                  after the test with recovery period of 2-4 hours.
                                              -2-
 S.        Test        Test No.                      Test specifications                            Expected
 No.                                                                                                  Time
5.     Altitude           3       Test Condition L2A2, Procedure 5                                  01 day
       (Operational)              Temperature: -300C ± 30C
                                  Altitude:4500 meters
                                  Air pressure: as per altitude
                                  Duration:16 hrs
                                  The UUT is kept in switched OFF condition during the 16
                                  Hrs test period.
                                  Visual examination and Performance check is carried out
                                  after the test with recovery period of 2-4 hours.
6.     Rapid             22       Clause 3.2.1 Procedure 1 Test Condition B                         01 day
       temperature                Duration:
       cycling                    High Temp: +550 ± 30C, RH <= 30% for 3hrs
                                  Low Temp: -400 ± 30C for 3hrs
                                  Transfer time: <= 15 min
                                  No. of cycles: One
                                  The UUT is kept in switched OFF condition. Visual
                                  examination and Performance check is carried out after the
                                  test with recovery period of 2-4 hours.
7.     Sealing           23       Procedure 1                                                       01 day
                                  Temp: 20ºC ±2 degC
                                  Test condition A (Air Pressure 25 kPA)
                                  Duration:30 minutes
                                  The air pressure reading at the end of 30 minutes period
                                  should not have fallen by more than 10 kPa.
8.     Driving Rain      12       Test Condition C:                                                 01 day
                                   The equipment shall be sprayed from 08 shower heads,
                                  four of them being directed at an angle of 450 and four
                                  directed horizontally at the centre of the area of each of the
                                  four sides of the equipment.
                                  Visual examination and Performance check is carried out
                                  after the eqpt is dried by wiping or by applying a blast of air
                                  at room temperature.
9.     Immersion         19       Test condition C                                                  01 day
                                  Depth of Water : 1m
                                  Period:2 hrs
                                  UUT is in unpacked & switched OFF condition. Seals shall
                                  be carried out, as required. UUT shall be completely
                                  immersed in water. Visual examination and performance
                                  check to be carried out after recovery period of 2-4hrs.
                                             -3-
 S.           Test    Test No.                       Test specifications                          Expected
 No.                                                                                                Time
10.    Dust             14       Clause 3                                                         01 day
                                 Temperature: 40±30C
                                 RH<50%
                                 Period:1 hr
                                 UUT is in unpacked and OFF condition. Dust caps to be
                                 fitted for all connectors. Visual examination for accumulation
                                 of dust and performance check to be carried out after
                                 recovery.
11.    Tropical         27       Test Condition C                                                 28 days
       exposure                  Temperature raised to 350C±20C over 3 hrs
                                 Relative humidity:95%
                                 Duration:12 hrs
                                 Temperature lowered to 200C±50C over 3 hrs
                                 Duration:06 hrs
                                 No. of cycles:28
                                 Visual examination and Performance check to be carried out
                                 after recovery of 2- 4 hrs for every 14 cycles.
12.    Mould growth     21       Clause 3                                                         28 days
                                 Tests to be performed on sample representative material
                                 Spray mixed spore suspension. Temperature: 30±10C
                                 RH>90%
                                 Duration: 28 days
                                 UUT in switched OFF condition.
                                 Visual Examination & Performance check (if required) to be
                                 carried out after the test.
13.    Corrosion         9       Procedure 2, Clause 3.3.2                                        04 days
       (Salt)                    Salt mist spray for 2 hrs and storage for 22 hours at
                                 350C±20C,
                                 Relative Humidity:90-95%
                                 Duration:22 hrs
                                 Total No. of Cycles-3
                                 Tests may be performed on sample representative material.
                                 UUT in switched OFF condition. Visual Examination to be
                                 carried out after the test.
14.    Drop             13       Clause 3.2.3                                                     01 day
                                 Test Condition F: 1000mm
                                 One drop at each corner, edge and face.
                                 Total : 26 drops
                                 UUT is in unpacked and switched OFF condition. Visual
                                 and Performance check to be carried out after the test.
                                                    -4-
 S.            Test         Test No.                       Test specifications                         Expected
 No.                                                                                                     Time
15.      Toppling              26       Topple on all edges tilted angle 450 from a 100mm height.  01 day
                                        No.of drops:4
                                        UUT is in unpacked and switched OFF condition. Visual
                                        and Performance check to be carried out after the test.
16.      Bump                   5       Shock Pulse: Half sine                                     01 day
                                        No.of bumps :4000 ± 10
                                        Peak acceleration : 400m/s2
                                        Pulse duration:6ms
                                        1 to 3 bumps per second.
                                        UUT is in unpacked and switched OFF condition. Visual
                                        and Performance check to be carried out after the test.
17.      Shock                 24       Procedure 2, Test Method A                                 01 day
                                        Half sine wave pulse 18ms duration, 3 Shocks/side (total
                                        18 shocks).
                                        Test to be carried out with UUT in switched OFF condition.
                                        Visual and Performance check to be carried out after the
                                        test.
Notes:
1.      The authority of making any changes in Environmental test parameters rests only with AHSP/
DGQA.
2.      Test severities mentioned are as per JSS 55555:2012 (Rev. No. 3), and cannot be relaxed.
However, the same are liable to be made more stringent, if so indicated by operation / storage conditions
specified by User, or equipment capability specified by manufacturer.Technical Specifications of of Tactical
Visual Wireless Data Module(TVWDM) are yet to be received, and changes in test conditions / severities
may ensue on scrutiny of the same.
3.      Performance checks will be carried out before and after each Environmental test. Tests constituting
the Performance checks will be finalised after vetting of draft ATP submitted by the firm.
4.      Dummy samples of sealed equipment may be used for Mould Growth and Corrosion (Salt) tests,
these tests being applicable only to components and finishes located outside the seal.
5.      Separate functional sample may be used for Tropical Exposure test.
6.      Sequence of tests as tabulated above is inviolate, and no deviation will be accepted.
7.      In case of any failure, Root Cause Analysis (RCA), duly mentioning methodology / QC tools used,
and Corrective and Preventive Action (CAPA) will be provided by Manufacturer. In case CAPA necessitates
any changes to documentation provided as per JSS 025, amended/updated document(s) will be submitted.
8.      Rejection criteria (No. of failures against which rectification and retrials permitted) shall be
mentioned in mutually agreed ATP, which will be provisionally approved before commencement of
evaluation.