PERSPECTIVE
SIGNED & SEALED:      PRC NO:      REVISIONS/GENERAL NOTES                                                         PROJECT TITLE:                APPROVED BY:   SHEET CONTENT:   SHEET NO.:
                                   shall provide shop drawings or architect's approval , "any discrepancy with
                      PTR No:
                      ISSUED AT:
                                   dimension/s and specification/s in plans contractors/sub-contractors shall
                                   inform and verify with the architect before proceeding any work and action.
                                   "each shall be notice that contractors/ sub-contractors shall strictly comply
                                   with the national building code and structural building code of the
                                                                                                                    PROPOSED 3 STOREY HOSPITAL                  -PERSPECTIVE        A
                                                                                                                                                                                    13
                                   Philippines or construction standards in all areas where deeds/ or
                      ISSUED ON:   construction guidelines and restriction are required to be followed.
                                   contractors and sub-contractors are mandated to comply and to                   LOCATION:
ELECTRICAL ENGINEER   TIN NO:      coordinate with its requirements.                                                                                    OWNER