The document outlines the Saudi Aramco Inspection Checklist for liquid coatings on industrial services and pipelines, detailing the acceptance criteria and specific requirements for coating procedures. It includes references to various Saudi Aramco Engineering Standards (SAES) and specifies the qualifications for personnel involved in coating activities. Additionally, it emphasizes the importance of adhering to safety requirements and proper inspection methods to ensure quality control in coating applications.

Uploaded by

Vignesh Msd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views2 pages

Saic H 2023

The document outlines the Saudi Aramco Inspection Checklist for liquid coatings on industrial services and pipelines, detailing the acceptance criteria and specific requirements for coating procedures. It includes references to various Saudi Aramco Engineering Standards (SAES) and specifies the qualifications for personnel involved in coating activities. Additionally, it emphasizes the importance of adhering to safety requirements and proper inspection methods to ensure quality control in coating applications.

Uploaded by

Vignesh Msd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

#

SAUDI ARAMCO ID/PIEU-31-Jul-2022 - REV.2022.07.00 (Standards Cutoff - July 31,2022) Rev 81 31-Jul-22
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure for Liquid Coatings on Industrial Services
& Pipelines-Buried Services SAIC-H-2023 31-Jul-22 COATING-
(APCS-113A,113 B, 113E & 113F)
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A General Requirements

Procedure is identified & traceable to Contractor's Quality System.


Sch. Q,
A1 Format is ISO format and contains basic ISO elements such as
Section 3.1
Scope, references, Responsibilities, Definitions, etc

SAES-H-001,
Procedure specifies all the Safety Requirements for coating application Sec. 5.1
A2
mandated in SAES-H-102. &
SAES-H-102

Procedure Contains the detailed repair Requirements.:


a. For coating system in immersion service, repair conforms to
SAES-H-001,
A3 SAES-H-001, Para. 9.5.
Para. 9.5 & 9.6
b. For other coating system, repair conforms to the requirements in
the applicable APCS and the manufacturer's technical data sheet.

B Specific Requirements Addressed in Procedure. (Procedure Elements)

SAEP-316,
Para. 5.1
Personnel involved in protective coating activities has been qualified and
B1 Sch. Q,
certified to perfom their task.
Attachment IV,
Para. 2.1

On Plot Projects
Includes the selection requirements and service Limitations of the Coating
Systems applied on the project:
a. Selection of coating material conforming to the requirements of
SAES-H-001, Sec. 7
SAES-H-001,
b. Compatibility with the existing coating per SAES-H-001,
Sec. 7 & 11
Para. 7.4.2
B2 &
c. Service conditions per the respective Coating system
para. 7.1.G of
(APCS) listed in SAES-H-001.
SAES-H-001.
d. For above ground atmospheric service, bolts and nuts
(fasteners) should be coated.
Use fluoropolymer coating which is applied in accordance with
09-SAMSS-107 for onshore and offshore. Galvanizing can be
used for onshore.

Saudi Aramco: Company General Use


# Saudi Aramco: Company General Use
#

Cross country Pipeline projects SAES-H-002


Includes the selection requirement and service limitations of the Coating Sec. 5 & 6
Systems applied on the project::
a. Selection of coating material conforming to the requirements of
SAES-H-002, Para. 5.1., 5.4, 5.5 & 5.6
b. Service conditions per the respective Coating system
(APCS) listed in SAES-H-002.
c. Carbon steel bolts and nuts that are included with the pipelines Para 5.1.1, 5.1.2,
B3
and fittings shall be externally coated. as per para. of 5.1.3 of SAES-H-
the General Requirements for External Coatings for corrosion 002
protection.
d. For buried service, the exposed areas of the bolts and nuts can
be coated with APCS-113A after permanent installation. If
frequent re-torque of the bolts and nuts are required during
inspection and maintenance, the application of a Fluoropolymer SAES-H-002
coating system under 09-SAMSS-107 is recommended. Para. 5.4.3

Specifies the Limitations of various Types of APCS-113 Coating System


provided in coating data sheets as mentioned below:
a. APCS-113A - Liquid Coating systems with high Solid content (>85 to
100% by volume) for buried pipeline rehabilitation in Subkha/ high water
table conditions
b. APCS-113B - Renovation and Repair Putty Type Coatings for Buried SAES-H-002
B4
Services. Sec. 6.4
c. APCS-113E - Fast Cure, Abrasion Resistance External Liquid Coating for
Thrust Boring Pipes in Road Crossing.
e. APCS-113F - External Liquid Coating for Girth Weld on Pipelines by
automatic rotational equipment.

Specifies Paint Storage conditions as recommended in SAES-H-001,Sec. SAES-H-001,


B5
6.2 Sec. 6.2

Specifies surface preparation requirements per SAES-H-001, Sec. 8. SAES-H-001


B6
Sec. 8

Includes Paint preparation and application requirements as per SAES-H- SAES-H-001,


B7
001, Sec. 9. Sec. 9
Quality Control, Inspection Methods & Acceptance Criteria as per SAES-H- SAES-H-001,
B8
001, Section. 10. Sec. 10

Incorporation of the Saudi Aramco Test & Inspection Plan with the Sch. Q,
B9
applicable S.A. Inspection Checklists (SAIC) and Test Reports (SATR). Section 3

REMARKS:

REFERENCE DOCUMENTS:
1. Schedule Q, Contractor's Quality Requirements, (Contract Edition)
2. SAES-H-001, Coating Selection & Application Requirements for Industrial Plants & Equipment, (23 May 2019)
3. SAES-H-102, Safety Requirements for Coating Applications, (29 October 2017)
4. SAES-H-002, Internal and External Coatings for Steel Pipelines and Piping, (22 February 2018)
5. SAEP-316, Performance Qualification of Coating Personnel, (31 July 2016)

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED