Showing posts with label moving house. Show all posts
Showing posts with label moving house. Show all posts

Monday, July 8

Back in the Saddle

This week I have resumed FlickFleet crafting in the new house!

We’re still in a chaotic state with boxes everywhere, but I’ve found the FlickFleet materials and started making games again. 

With my crafting table in pieces on a pile of boxes in the garage I’ve had to improvise, and I’ve been using the kitchen island instead.

Bon appétit!

The good news is that this is a better height for standing at (I stand up to cut out the labels and dashboards) but worse for sitting at (the bar stools are much less comfortable than my office chair!).

Last week I made 16 copies as planned and this week I have everything I need to make 10 of my 16 target, then I've run out again. So we’ve arranged for Paul and his family to come up and see our new house (and bring everything he’s made that I need to complete the Kickstarter rewards: 87 cut box blanks, 87 bags of sorted bits and all the postage boxes he’s got). 

That will remove one of the obstacles to hitting our deadlines: our need to meet up periodically and exchange things made at one or the other house!

Monday, June 24

All Change!

Tomorrow we move house. It's only a short move (about 1.5 miles), but it's the first time we've bought and sold a house on the same day and the first time we've moved with kids (now aged 6 and 2). It's been remarkably stressful, but hopefully by mid-afternoon tomorrow we should be in our new house surrounded by piles of boxes.

I've spent the last week trying to get as much stock finished as possible and then getting that in the post (or stored under my desk at work so that the movers can't damage it in transit). The un-assembled stock is still here though, but as flat sheets of card or greyboard in sturdy boxes I'm less worried about that!

I'm not expecting to get much crafting done over the next couple of weeks as we'll still be frantically unpacking/working out where things live/sorting out our stuff, but at this point we're still on track for finishing fulfilment by the end of August - four months ahead of schedule!

In time, we're hoping to make the smallest bedroom an office for Eurydice Games, but for the moment it'll be The Toddler's room until we sort out some of the other rooms. I'm really looking forward to having a dedicated crafting space :-)

Until then I have a lot of stuff to put in boxes, and then a lot of stuff to take out of boxes - wish me luck!

Monday, June 17

Hiatus II: Return of the Hiatus

After three months of living in limbo, it appears that we finally have a date for our house move: next Tuesday. So I have just over a week to sort our stuff out and get rid of as much finished stock as possible to avoid it getting damaged in the move. The good news is that I currently only have one finished copy of both FlickFleet and Zombology and three half-finished Zombology copies. I need to finish those by Thursday as I'll be restocking our only retailer, Travelling Man, in Manchester on my way home from a work trip.

I’m also going to meet Paul in York and pick up some more FlickFleet bits on my way through, though I’ll leave those under my desk at work until I get the move over with.

I’ve planned for a few weeks of no crafting as we settle into the new house and start sorting out all our stuff and yet still expect to get all the Kickstarter rewards in the Post by the end of August - several months ahead of schedule.

For now though my focus needs to be on sorting out our belongings for the move!

Tuesday, May 28

Hiatus Averted!

Last week was a particularly weird one as we didn't know until Wednesday whether or not we were moving house on the Friday! I was trying to hedge my games production so that I didn't have loads of half-made games kicking around the house that might get damaged during the move - my goal was to try to finish and ship as much as I could without starting more.

As it was, we found out on Wednesday afternoon that the move wasn't possible (it was a very last minute rush that had a fairly low chance of happening) so I was able to return to production over the weekend.

We've now made (and almost shipped!) all of the rewards except the Bombers (a copy of FlickFleet and a copy of Zombology) and the Fighters (a standard copy of FlickFleet). That sounds great, but there's nearly 100 Fighters to do, so there's still a chunk of work ahead of us.

With the Bombers at the top of the pile now I've gone back to making Zombology copies as we need to ship 20 of those over the next few weeks. I had four finished FlickFleet boxes left over from last week's crafting and five Zombology box blanks, so I've labelled them up and cut the cards so I could post those four rewards. On my way back from Manchester on Tuesday I met Paul again and gave him a couple of copies of FlickFleet for a friend of his and accepted from him the rest of the box blanks I needed for finishing the Bombers, plus the bagged bits for all twenty of the Bomber FlickFleets.

My plan was to dump all the stuff I got from Paul under my desk at work if we moved this week so it was safe from damage in transit during the move, but with that avoided, my new goal is to try and get as much of it in the post before the move (which is now up in the air again - hopefully some point in June!).

I'm really appreciating Paul taking on the box blank cutting, as that's saving me about five minutes per game, which doesn't sound like much but it's almost 25% of my construction time, so it makes a big difference! The other benefit is that all the box card is now at Paul's not stacked up under my spare bed, so that's one other thing I don't have to worry about the movers damaging!