Unit#1 DC Light
Date__/__/__
 Sl.No.    Area/Location                                Total Lights   Working lights
 1         Tg 0 Mtr.                                        05
 2         Tg 8.5 Mtr                                       08
 3         Tg 16 Mtr.                                       11
 4         Tg 31 Mtr.                                       08
 5         Tg 36 Mtr                                        00
 6         0 Mtr Cable gallery                              01
 7         5.5 Mtr Cable gallery                            02
 8         8.5 Mtr Cable gallery                            03
 9         8.5 Mtr 24V Ups Room                             02
 10        8.5 Mtr C&I Room                                 02
 11        8.5 Mtr Battery Room Room                        03
 12        12.5 Mtr Cable gallery                           03
 13        27 Mtr Cable gallery                             02
 14        3.5 Mtr.Battery Room                             04
 15        3.5 HT Switch gear                               10
 16        12.5 LT Switch gear                              09
 17        27M BMCC                                         06
 18        Tg Stairs Sg Pump C Row                          25
 19        Tg C Row Stairs Dumping Valve Side               16
 20        Tg A row Switcg gear Side Stairs                 10
 21        Tg A Row Mot Side Stairs                         08
 22        CCR #1                                           41
Checked By: Operation Executive           Designation             Group-
Name:
 Unit#2 DC Light
 Date__/__/__
 Sl.No.    Area/Location                                  Total Lights   Working lights
 1         Tg 0 Mtr.                                          16
 2         Tg 8.5 Mtr                                         17
 3         Tg 16 Mtr.                                         22
 4         Tg 31 Mtr.                                         04
 5         Tg 36 Mtr                                          00
 6         0 Mtr Cable gallery                                03
 7         5.5 Mtr Cable gallery                              02
 8         8.5 Mtr Cable gallery                              04
 9         8.5 Mtr 24V Ups Room                               04
 10        8.5 Mtr C&I Room                                   03
 11        8.5 Mtr Battery Room Room                          02
 12        12.5 Mtr Cable gallery                             03
 13        27 Mtr Cable gallery                               03
 14        3.5 Mtr.Battery Room                               04
 15        3.5 HT Switch gear                                 08
 16        12.5 LT Switch gear                                08
 17        27M BMCC                                           05
 18        Tg Stairs Sg Pump C Row                            19
 19        Tg C Row Stairs Dumping Valve Side                 15
 20        Tg A row Switcg gear Side Stairs                   10
 21        Tg A Row Mot Side Stairs                           04
 22        CCR #2                                             16
Checked By: Operation Executive:          Designation :             Group:
Name:
 Unit#3 DC Light
 Date__/__/__
 Sl.No.    Area/Location                                Total Lights   Working lights
 1         Tg 0 Mtr.                                        07
 2         Tg 8.5 Mtr                                       06
 3         Tg 16 Mtr.                                       13
 4         Tg 31 Mtr.                                       03
 5         Tg 36 Mtr                                        00
 6         0 Mtr Cable gallery                              03
 7         5.5 Mtr Cable gallery                            04
 8         8.5 Mtr Cable gallery                            03
 9         8.5 Mtr 24V Ups Room                             04
 10        8.5 Mtr C&I Room                                 03
 11        8.5 Mtr Battery Room Room                        02
 12        12.5 Mtr Cable gallery                           05
 13        27 Mtr Cable gallery                             02
 14        3.5 Mtr.Battery Room                             04
 15        3.5 HT Switch gear                               06
 16        12.5 LT Switch gear                              08
 17        27M BMCC                                         05
 18        Tg Stairs Sg Pump C Row                          10
 19        Tg C Row Stairs Dumping Valve Side               00
 20        Tg A row Switcg gear Side Stairs                 08
 21        Tg A Row Mot Side Stairs                         09
 22        CCR #3                                           16